16.08.2013 Views

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Slow Start :<br />

Following cleansing operations, the contractor shall allow in his arrangements and<br />

operating instructions, for manually controlled slow start of the filters.<br />

Wash water gutters :<br />

Materials for wash water gutters shall be concrete. The upper edge of the gutter<br />

shall be placed sufficient near to the surface of the sand so that a large quantity of<br />

dirty water is not left in the filter after the completion of washing. The edge of the<br />

trough shall be slightly above the highest elevation of the sand as expanded in<br />

washing. The maximum water level in the gutter shall be 50mm below the gutter<br />

upper edge. The trough, shall be designed as free falling weirs as spill ways.<br />

21.21 Outlet chamber.<br />

Each compartment of every filter adjacent to filtrate outlet shall be connected to the<br />

common filter water collection channel. The chambers shall be covered with sheet<br />

glass, fixed in a removable aluminum frame with a lighting arrangement to see the<br />

quality of water.<br />

The flooring for inspection chamber shall be in white glazed tiles. The walls of the<br />

inspection chamber shall be covered with white glazed tiles for full height.<br />

The minimum capacity of chamber shall be 1.00 m . Each chamber shall discharge<br />

in to the channel over a sharp edge weir plate within the chamber, the contractor<br />

shall provide an adjustable wall mounted calibrated brass gauge to enable the<br />

operators to estimate the approximate filter discharge rate.<br />

Each filter bed shall be provided with rate of flow cum loss of head indicators.<br />

Each filter bed shall be provided with high water level indicator for start of back<br />

wash.<br />

21.22 Filter gallery and filter machinery hall pipe works (general).<br />

Filter gallery water carrying pipe work shall be in either steel or cast iron with<br />

flanged connections, with a provision of detachable flanged couplings to facilitate<br />

maintenance of valves and fittings. The filter gallery and machinery hall pipe work<br />

shall be arranged for ease of operation, access for maintenance to minimize<br />

undesirable head losses in the works.<br />

DTS : Detailed Tender Specification. Page 253

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!