21.18 Filter floor & under drainage system.<br />

In the conceptual design nozzles and suspended floor arrangement has been<br />

proposed. The filter media shall be supported on suspended floor fitted with long<br />

stemmed plastic floor nozzles and designed to pass the air and water required for<br />

the reverse flow cleaning and to exclude the media from the filter base and outlet<br />

systems. The filter shall be manufactured in precast concrete segments with<br />

accurately set screwed thread plastic nozzles fixing sleeves. Nozzles shall be evenly<br />

spread over the full floor area with a concentration of at least 50 per m . During<br />

installation of any floor, all nozzle socket shall be plugged until nozzle fitting<br />

commences. The contractor can also propose the piped under drain system. In the<br />

event of adopting similar system, the contractor shall provide reinforced<br />

concrete flooring with slots in each section to filter to accommodate manifold, or he<br />

may provide concrete channel in each section to collect and convey pure<br />

water/backwash water and air flow/ to the under drain laterals.<br />

21.19 For piped under drains.<br />

Complete hydraulic calculation for laterals orifices, and manifolds, and the<br />

tolerance ratios of their areas with the filter area, also the inter-relations of the areas<br />

of all the components of under drain systems.<br />

The contractor shall clearly indicate at the tender stage the arrangements he<br />

proposes to connect the laterals with the manifold and backwash water and air<br />

arrangement.<br />

21.20 Filter cleansing.<br />

Filter cleansing shall be by (upward) reverse flows of air and water. Systems<br />

employing separate air and water washing are envisaged. Both sections (halves) of a<br />

filter unit shall be washed at the same time. The air supply shall be taken from one<br />

of the air blowers and the water supply from over head system proposed.<br />

Cleansing and sequence :<br />

The Contractor shall fully .Justify in his tender submission. the filter cleansing<br />

system for the contractor's particular version of the conceptual design. The<br />

contractor shall include consideration of water loss, design sequence and timings,<br />

rise rates, the water temperature, surface travel distance for wash water, case of<br />

operation timings as duration's of the wash period etc.<br />

DTS : Detailed Tender Specification. Page 252