The chlorinators shall be arranged in a separate moisture proof chlorine room. The<br />

chlorine room shall be accommodated in connection with chlorine drum storage on<br />

the ground of chemical house. The Contractor shall provide an air tight glazed<br />

partition or windows in the chlorinator room to enable the staff to inspect the rates<br />

without entering the room. Adequate externally switched vapour and chemical<br />

proof lighting shall be provided and detailed by the contractor on the drawing.<br />

Apart from the chlorinators no other equipment shall be accommodated in the<br />

chlorine room. Door ways to the room shall be shown as outward opening and<br />

preferably to the building exterior. The contractor shall include suitable pressure<br />

reducing valves to limit the pressure delivered to 2 bars.<br />

21.9 The standards required for the pipes and fitting shall be:<br />

Pipe work for chlorine gas shall be mild steel seamless to B.S. 3602 C.D.'S. or<br />

H.F.S. or electrical resistance welded pipe to BS 3602.<br />

Pipe couplings shall be with British standard H Flanges (front and back welded)<br />

using ring joints tagged made to 1/16 thickness compressed/asbestos fiber CAF BS<br />

2815 grade B.<br />

Valves shall be of the globe type with forged steel bodies monel metal spindles and<br />

valve heads with malleable cast iron valve seats. Gland packing shall be of Teflon.<br />

Pressure gauges shall be of the silver diaphragm type.<br />

The Contractor shall draw his water supplies from the back wash tank and shall not<br />

provide any facility for feeding the chlorinators from any other source.<br />

Dosing lines shall be provided for post chlorination point for the proposed systems.<br />

21.10 Clear water channel from the filter house.<br />

The Contractor shall provide following safety equipment in the works as a<br />

minimum:<br />

Two Nos. canister type respirators with full face coverage of a make suitable for<br />

chlorine gaseous atmosphere.<br />

Four spare canisters for the respirators.<br />

DTS : Detailed Tender Specification. Page 247