The Contractor's attention is invited to current India Design Codes of Practices and<br />

the Manual of Water Supply and Treatment, 1999 or its latest edition prepared by<br />

the expert committee and published by the Ministry of the works and Housing, New<br />

Delhi, India.<br />

The Commissioning and testing of the plant and trial run of plant under actual<br />

working conditions for continuous 6 months is included in completion period. If<br />

there is any lapse in trial run due to any reason, trial run periods shall be extended to<br />

compensate the lapse to make up. The trial run period shall include atleast<br />

2 continuous months during the monsoon season. In case the monsoon season<br />

conditions are not met with the turbidity in the water for the required maximum<br />

shall be stimulated by adding bentonite clay or to other such compound. The<br />

completion test shall be taken over for the design flow. All consumables except<br />

untreated water during Trial Run period of 6 months shall be arranged and supplied<br />

by the contractor at his own cost. The maintenance defect liability period of<br />

12 months defined elsewhere on the Tender documents shall commence form the<br />

date of issuance of final Acceptance Certificate after successful completion of<br />

commissioning, test and trial run period.<br />

Two Nos. automatic gas leakage detector shall be provided. One each in<br />

chlorinating rooms and in chlorine store.<br />

The Contractor shall provide forced ventilation equipment in the chlorine store and<br />

chlorination room which shall be manually controlled by external switches outside<br />

the rooms at each doorways. The ventilation systems to be provided shall have the<br />

following capacity of air changes per hour upon operation of any one switch for the<br />

store and chlorine rooms and shall extract air at ground level outside the building.<br />

For continuous operation : 3-4 air changes<br />

For Emergency operation : 20 air changes<br />

The contractor shall provide all the purpose made ducts and outlets required. The<br />

ventilation blowers shall be inward blowing at high level for bringing fresh air<br />

exhaust fan with at low level. The machines shall be suitable for use in a damp<br />

chlorinous atmosphere.<br />

Each of the gas metering chlorinators of requirements and types set out in the tender<br />

document shall have the following facilities:<br />

a. Manual adjustment of dose rate<br />

b. Substantially linear scale<br />

c. Internal gas inlet pressure reducing valve<br />

d. Safety vent to be piped to external atmosphere,<br />

e. Pressure and vacuum relief valve.<br />

DTS : Detailed Tender Specification. Page 246