P H adjustment, lime solution is proposed to be used. For preparation of lime<br />

solution, 2 lime mills are proposed to be installed. Lime dosage shall gravitate to<br />

the raw water inlet stilling chamber, an area of maximum turbulence, for proper<br />

mixing of the solution. The chemical house shall be of 2 storeyed building of size<br />

10mx28m to fit the land availability at the site. The 2 nos. Alum mills and 2 nos.<br />

Lime mills of the existing water treatment plant are also proposed to be re-allocated<br />

at the ground floor of this building in addition to the alum mills and lime mills for<br />

the new treatment plant. The ground floor shall also be provided with space for<br />

storage of chemicals viz. Alum and lime including separate room for storage of<br />

chlorine gas cylinder, absorption tower, chlorine gas panel for water disinfection.<br />

The 1 st floor of the building shall housed laboratory etc. where a full fledged<br />

dedicated and well equipped laboratory is also proposed to be set up.<br />

Rapid mixing :<br />

For rapid mixing of raw water with the coagulant, flash mixer is proposed to be<br />

installed. After measuring channel, raw water alongwith coagulant shall enter a<br />

flash mixing well where the coagulant added shall be rapidly and intimately mixed<br />

with raw water by the agitator assembly.<br />

Clari-flocculator :<br />

Primary treatment : Under this package, it is proposed to construct clari-flocculator<br />

identical in size and shape and having same level of construction as that of the<br />

clari-flocculator of existing 34.05 MLD water treatment plant. The clarified/settled<br />

water of both the clarifier shall be shared by both the filtration plant i.e. existing<br />

34.05 MLD and proposed 8 MLD by interconnecting the clarified/settled water<br />

channel of both the clari-flocculator. Dosed water from flash mixer shall flow<br />

through a hume pipe of 600mm bore to the central shaft of the respective clarifier<br />

and enter the flocculating zone at the top of the shaft through 4 openings in the<br />

shaft wall, each opening 600mm high and 150mm wide. In the flocculating zone,<br />

which shall be 15m dia. with an effective flocculating depth of 4.5 m, the water<br />

while flowing downwards shall be stirred by 3 sets of flocculator paddles. It shall<br />

then passes below the flocculator wall to the settling zone of the clarifier flowing<br />

radially outwards and upwards to the outlet launder. The clarifier shall have a<br />

diameter of 37m and side water depth of 4m. The detention time of flocculator shall<br />

be 30 minutes and that of clarifier 2.8Hrs.<br />

DTS : Detailed Tender Specification. Page 240