16.08.2013 Views

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ii) Suitable face masks shall be supplied for use by workers when paint is applied in the<br />

form of spray or a surface having lead paints dry rubbed and scarped.<br />

iii) Contractor shall supply overalls to workmen and adequate facilities shall be provided<br />

to enable working painters to wash during and on cessation of working periods.<br />

Working near water.<br />

When the work is done near any place where there is risk of drowning, all necessary<br />

equipment shall be provided and kept ready for use and all necessary steps taken for<br />

prompt rescue of any person in danger and adequate provisions made for prompt<br />

first aid treatment of all injuries likely to be sustained during the course of the work.<br />

Hoisting machines.<br />

Use of hoisting machines and tackles including their attachments, anchorage and<br />

supports shall conform to the following:<br />

a) i) These shall be of good mechanical construction, sound material and<br />

adequate strength and free from patent defects and shall be kept in good repair<br />

and in good working order.<br />

ii) Every rope used in hoisting or lowering materials or as a means of suspension<br />

shall be of durable quality and adequate strength, and free from patent defects.<br />

b) Every crane driver or hoisting appliance operator shall be properly qualified and no<br />

person under the age of 21 years shall be in-charge of an hoisting machine, including<br />

any scaffold winch or giving signals to operator.<br />

c) In case of every hoisting machine and of every chain ring hook, shackle, swivel and<br />

pulley block used in hoisting machine or lowering or as means of suspension, safe<br />

working load shall be ascertained by adequate means. Every hoisting machine and all<br />

gear referred to above shall be plainly marked with safe working load in case of<br />

hoisting with safe working load. In case of hoisting machine having a variable safe<br />

working load and the conditions under which it is applicable shall be clearly indicated.<br />

No part of any machine or of any gear referred to above in this paragraph shall be<br />

loaded beyond safe working load except for the purpose to testing.<br />

d) Engineer shall notify the safe working load of the machine in case of departmental<br />

machine. As regards Contractor’s machine, the Contractor shall notify safe working<br />

load of each machine to the Engineer. Whenever he brings to the site of work and get<br />

it verified by the Engineer.<br />

GTS : General Technical Specification. Page 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!