xx) Air blower of 500 cfm capacity at 5 psi complete with motor and<br />

accessories and pneumatically operated bypass valve.<br />

DTS : Detailed Tender Specification. Page 237<br />

1 no.<br />

xxi) 80mm C.I. ring main connecting blower to filters. 1 range.<br />

xxii) 80mm C.I. air valve with pneumatic cylinder and air piping<br />

connection to control console. 12 nos.<br />

xxiii) Wash water tank filling pump of capacity approx. 60 lps at 20m<br />

head with suction pipe in filtered water sump and delivery header<br />

and piping to wash water tank. Starter of pump inter-locked with<br />

alarm indicated in (xviii) above.<br />

xxiv) Control console, housing air cylinder operating four port valves,<br />

R.O. F & L.O.H. indicator alarm and dials, rate setter wheel and<br />

scale, air pressure gauge, glower starter station, wash water tank<br />

level indicator. Console with sun mica on M.S. frame.<br />

.<br />

xxv) Garage type air compressor complete with motor air vessels autopressure<br />

switch and other accessories for providing compressed air<br />

for operating pneumatic cylinders.<br />

2 nos.<br />

6 nos.<br />

1 no.<br />

xxvi) (a) Syphon 600mm wide (C.I.) 36 nos.<br />

(b) B.M Syphon activators with G.I. piping to siphon. 12 sets.<br />

The different components of the 34.05 MLD Water Treatment Plant were designed<br />

and constructed based on the raw water quality prevailing during the period of late<br />

70s and early 80s where the turbidity of water does not exceed 50 PPM.<br />

From the late 90s onwards, the turbidity of raw water has increased considerably on<br />

account of stone and sand quarrying activity in the catchment at the upstream<br />

reaches of the Umiew river. The turbidity during the period from April to October is<br />

in the range of 350-1500 NTU and during the off monsoon months ranges between<br />

100 to 350 NTU. On account of the high turbidity of water during the monsoon<br />

months, the clari-flocculator of the existing 34.05 capacity WTP has become<br />

overloaded adversely affecting the functioning of the Filtration Plant on account of<br />

increased frequency of backwashing.<br />

The water treatment units of the 34.05 MLD WTP of the existing project<br />

viz. Plant, equipments & machineries like valves of different sizes, drives,<br />

backwash pump, air blower and control panel etc. has outlived the designed life and<br />

are proposed for replacement with plant, equipments & machineries which are<br />

compatible with automation control and visualization system under a separate<br />

scheme and outside the scope of this package.