16.08.2013 Views

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ii) Agitator drive comprising electric motor coupled to agitator shaft<br />

through speed reducing gear, complete with couplings and motor<br />

starter. The details are: 1 set.<br />

4. Clarifier-cum-flocculator<br />

i) MS fabricated bridge rotating round central pivot and resting on three<br />

carriages on flocculator walls; carriages running on light rail track<br />

fixed to the top flocculator and clarifier walls.<br />

ii) Sludge scraper assembly under slung from bridge sweeping entire<br />

clarifier and flocculator area.<br />

DTS : Detailed Tender Specification. Page 235<br />

1 no.<br />

1 set.<br />

iii) Bridge drive comprising electric motor driving bridge through speed<br />

reducing gear unit and chain and sprocket transmission to wheel axle. 1 set.<br />

iv) Flocculator paddle assembly of MS cross arms holding MS plate<br />

blades, arms fixed to MS vertical shaft, shaft suspended from special<br />

bearing assembly resting on bridge.<br />

3 sets.<br />

v) Flocculator paddle drive comprising electric motor coupled through<br />

speed reducing gear box and pulley V-belt to vertical paddle shaft.<br />

The details are: 3 sets<br />

vi)<br />

Central pivot assembly of CI with radial and thrust bearing and cable<br />

duct.<br />

vii) Current transfer slip ring unit at central pivot and one carriage on<br />

clarifier wall.<br />

viii) 300mm CI sludge pipe for desludging, from sludge collecting pit<br />

inflocculator floor to common sludge well, with 300x300x150 tee at<br />

end in sludge well; main end of tee fitted with 300mm CI sluice<br />

valve, extended spindle, head stock and hand wheel and branch of tee<br />

fitted with 150mm CI sluice valve, extension spindle and pneumatic<br />

cylinder, pilot valve and electrical autotimer activator.<br />

ix) Constant bleed arrangement comprising 50mm GI piping with 50mm<br />

GM valve<br />

x) 80mm CI cable pipe from outside clarifier below floor, to central<br />

shaft.<br />

5 Filters.<br />

i) Inlet penstock 400mm C.I. circular with rising spindle operated by<br />

pneumatic cylinder, complete with air connection piping to control<br />

console.<br />

1 no.<br />

1 no.<br />

1 range<br />

1 range<br />

1 range.<br />

6 nos.<br />

ii) Inlet wall pipe C.I. 400mm flanged and plain end. 6 nos.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!