sets are to be constructed in the civil works matching with the foundation details to<br />

be had from the pump manufacture within the terms of the contract. Similarly the<br />

equipment load data as may be required for civil construction shall also be arranged<br />

by the contractor from the pump manufacturer. The offered pumps motors and other<br />

equipments shall match the stated requirements (foundation plan, total available<br />

floor area, minimum height of crane with minimum hook clearance over floor etc.)<br />

as shown in the layout drawing and a line of confirmation for the same shall be<br />

furnished with the technical offer.<br />

The H.T/L.T. Power, control and signal cables from the respective switch/breaker/<br />

electrical outlets shall be partially within metallic tray/hangers in the pump house<br />

enclosure. All cable laying, supply, fixing of cable trays/hangers as required shall<br />

lie in the scope of this job.<br />

The <strong>Bid</strong>der shall also furnish the details of foundation of the electrical Panel Board,<br />

pipes, valves and special etc. The <strong>Bid</strong>ders are advised to give a confirmation on<br />

clear term that the layouts are acceptable to them fulfilling all technical<br />

requirements of their offered equipments. The equipment layout details, data etc.<br />

are to be clearly incorporated in the layout drawings by the <strong>Bid</strong>ders and are to be<br />

submitted along with the offer.<br />

20.4 Information to the <strong>Bid</strong>ders to work out the system.<br />

The following factors are to be considered in design and selection of pumping<br />

machineries :<br />

Daily demand of water = 8.00mld.<br />

Hours of pumping = 20 Hrs/Day.<br />

RL of water level at the<br />

Intermediate RCC sump = 1561.00+ water level in the<br />

sump.<br />

Dia of rising main = 0.50m<br />

Length of rising main = 2500Rm.<br />

Material of rising main = ERWS pipe.<br />

RL at point of discharge<br />

(site for construction of Reservoirs) = 1847.00m<br />

Number of pumps to be installed = 3 Nos.<br />

Duty pump = 2 Nos.<br />

Standby pump = 1 No.<br />

Type of liquid to be pumped = Raw water.<br />

Maximum Turbidity of water = 1500 NTU.<br />

DTS : Detailed Tender Specification. Page 226