The different levels in the proposed RCC Sump at intermediate stage pumping<br />

station and the water treatment plant have been indicated in the document based on<br />

which the <strong>Bid</strong>der shall calculate the pump working heads at different conditions. To<br />

calculate the frictional head loss in straight pipe, Hazen William’s formula taking<br />

‘C’ value as 100 shall be considered. In order to estimate the frictional head loss for<br />

bends, curves, valves, specials etc. in the Raw Water rising Main an increment of<br />

20% on the calculated frictional head loss of the rising main shall be considered.<br />

The system may also demand for solo pump operation in varying level conditions of<br />

the sump and the pumps shall be suitable for solo as well as parallel operation. The<br />

pump duty point shall be considered at the individual pump flow of the combined<br />

station flow by 2 pumps. However, the pumps shall be suitable for continuous<br />

operation both solo and 2 pumps in parallel mode.<br />

The RCC sump and pump house shall have a provision of installing 3 more<br />

horizontal split casing pump sets so as to feed the raw water to the additional Water<br />

Treatment Plant to be constructed adjacent to the present one. The existing rising<br />

main of 500mm dia. shall transport the raw water in the present and future demand.<br />

Thus in future, there shall be an additional pump battery of 3 pump sets having<br />

2 working and 1 standby system to meet both for the present and future demand as<br />

stated above.<br />

20.2 Scope of electro-mechanical works.<br />

The Scope of Work covers selection, manufacture, testing at manufacturer’s works,<br />

supply and delivery to store at project site properly packed for transportation on<br />

F.O.R site basis, receiving at store and site including loading and unloading at all<br />

terminal points, safe storage, installation, pre-commissioning activities, trial run,<br />

commissioning, field testing, operation and maintenance for a period of 3 months of<br />

the plant with all associated equipments and ancillaries. All electro-mechanical<br />

components of the pump house including pumps, motor, starters, H.T./L.T. Panel<br />

boards, pipes, valves and specials, overhead crane and trolley etc. shall be under the<br />

scope of this tender. Both suction and delivery valves inside the pump house shall<br />

be butterfly valves with motorized actuator and position indicator. Arrangement of<br />

feeding H.T./L.T., 3 phase A.C. Power supply to the H.T./L.T. Panel Board in the<br />

Pump House shall not however be under the scope of this tender and the same shall<br />

be arranged separately by the employer/owner. Pumps, motors and other associated<br />

equipments shall be compatible with VVVF drives including automation control<br />

and visualization system. VVVF drives and PLC system is however outside the<br />

scope of this tender.<br />

DTS : Detailed Tender Specification. Page 224