Chapter 20<br />

Technical specification for electro-mechanical Plants,<br />

equipments and accessories for Raw water Intermediate<br />

pumping station.<br />

20.1 Intent and Requirement.<br />

Intent :<br />

The intent of the tender is to select, manufacture, testing at Manufacturers’ works,<br />

supply and delivery in duly packed condition F.O.R project site, installation,<br />

commissioning of horizontal split casing pumping sets with accessories installed in<br />

the Raw Water intermediate pumping station with other equipments, field testing,<br />

operation and maintenance etc. as per the technical specification and other terms<br />

and conditions. The horizontal split casing Raw Water pumping sets will serve as<br />

the intermediate stage pumps of the 8 MLD water treatment plant of<br />

GSWSP Phase <strong>II</strong>I.<br />

Source and Pump House :<br />

The source of water shall be the RCC sump which shall receive and collect the<br />

water lifted by the intake pumps. Intermediate pump house is proposed to be<br />

constructed at the location about 750m distance from the intake pumping station.<br />

Horizontal split casing pumping sets shall be installed in the Pump House. Under<br />

the scope of this tender the electrical control switches H.T/L.T. Board, indication<br />

and metering, instrumentation etc. shall be housed in the Pump House to be<br />

constructed for the purpose.<br />

Present Phase and Future Phase Requirement :<br />

There shall be total 3 nos. horizontal split casing pumps of identical type for the<br />

present phase and the same shall be operated as two pumps in parallel conditions of<br />

any combination and shall deliver the station flow of 8 MLD in 20 Hrs. of operation<br />

by 2 pumps. Raw water shall be transported from the intermediate pumping station<br />

to the water treatment plant through a 500mm MS rising main pipe having<br />

approximate length of 2500Rm.<br />