e) Exhaust fan: For ensuring open ventilation, adequate nos. of Exhaust fan (300 mm<br />

size) shall have to be provided by the contractor to allow 12 air changes per hour<br />

inside the pump house.<br />

f) Special specifications<br />

i) Before fixing all switches, fittings etc. the same should be produced<br />

before Employer/Employer’s representative and got approved.<br />

ii) All metal Switch Boards, Junction Boxes and Switch regulator boxes to<br />

be used in work shall be painted with 2 coats of antirust primer (red oxide<br />

paint) prior to erection. After erection they shall be again painted with 2 coats<br />

of enamel paint of approved quality.<br />

iii) Before execution of any portion of conduit work for wiring, a neat and<br />

proper layout should be made out by the contractor and got approved from the<br />

Employer/Employer’s representative.<br />

iv) While laying the conduits for concealed wiring in the ceiling or in the<br />

beams and columns and before casting, the contractor must ensure that all the<br />

inlets at both ends of the conduits are plugged by means of dead end socket so<br />

that no. foreign matter enter the conduits and choke them.<br />

v) Damage to any fitting and civil structures during erection and before<br />

handing over the installation by the contractor shall be set right or replaced by<br />

the contractor at his own cost.<br />

vi) Caution Board of proper size wherever required shall be provided as per<br />

IEE regulations for which no extra payment will be admissible.<br />

vii) Earthing installation shall be done in presence of Employer’s<br />

representative.<br />

viii) The installations should not be energized without adequate earthing.<br />

ix) The IC switches and DB shall be provided with neat lettering in block<br />

letters with paints for identification of the IC switches and for the points<br />

connected to each fuse way of the DBs’ for which no extra payment will be<br />

admissible.<br />

DTS : Detailed Tender Specification. Page 221