Then the equipments shall be put into trial run operation processing from no load to<br />

full load condition. During the trial run operation, checking all mechanical rigidity,<br />

alignments, clearance etc. shall be made by the contractor with proper readjustment<br />

if necessary. The plants & equipments shall also undergo for continuous operation<br />

at normal full load including operation at different working duty points as far as<br />

possible for both solo & in parallel operation of the pumps. Checking & Testing of<br />

the indications & control system of the instrumentation in the local control Panel<br />

shall also be conducted.<br />

The vibration analysis of the installed rotating equipments shall be conducted.<br />

During the trial run operation the equipments shall also have to pass through all<br />

field tests & field performance tests. The entire trial run process commissioning<br />

activities shall be conducted as per direction of the authorized representative of the<br />

Employer & under the direct supervision of the Pump manufacturer.<br />

After the successful commissioning of the entire plant, the Pumping station shall be<br />

operated by the contractor for a period of 3 months. All the personal required for<br />

effective operation & maintenance of the plant in shifts & all consumable spares/<br />

inputs, sundries, etc. as required shall be arranged by the contractor at his own cost.<br />

During the period of operation & maintenance of the plant, necessary training is to<br />

be imparted to the personnel of the employer at no extra charge for such training.<br />

19.32 Small Power, lighting distribution and illumination system.<br />

General.<br />

The compute internal and external lighting and small power requirements shall be<br />

provided for the pumping station and all plant areas under the scope of this package.<br />

In addition, it also provides lighting to selected areas during the plant emergency<br />

conditions.<br />

The system will be installed in an adverse industrial environment.<br />

Equipments/installations in some areas will be subject to vibration, corrosive<br />

chemical/oil/water vapour as prevalent in mining and ore processing plant/intake well<br />

etc.<br />

The design shall be such as to provide minimum lighting levels as required for<br />

different areas.<br />