19.30 Equipment transfer trolley.<br />

One MS structural construction, rubber tyre 4 wheel trolley having manual<br />

push/pull arrangement from back/front with manual operating brake and brake lever<br />

etc. shall be supplied, for placing and transfer of the equipments/components from<br />

bank end to pump house over the gangway and vice versa. The trolley shall be<br />

capable enough to transfer the heaviest components at one time subject to<br />

minimum 1 (one) tonne capacity. The width and wheel base of the trolley shall be<br />

such that it can easily move over the centre portion of the gangway after laying the<br />

rising main for the present and keeping provision on laying one similar size rising<br />

main for future at the flanks of the gangway. However the size of the trolley shall<br />

be at least 1750 mm. long x 1500 mm. width.<br />

19.31 Erection, testing and commissioning, operation and maintenance.<br />

In addition to what has been stated close where in this document, the following<br />

shall be undertaken.<br />

All the equipments shall be installed at site following the test engineering practices<br />

and the direction of the authorized representative of the employer observing all<br />

recommendation and guide lines of the respective equipment manufacturers and<br />

obeying all statutory rules, safety regulations, IE rules and acts etc. Appropriate tool<br />

and tackles as would be required for proper installation/erection work shall be used.<br />

The installation work shall include supply erection, grouting of all foundation bolts,<br />

nuts, washers, channels, sole plate, machine plate, wages, supports etc. as would be<br />

necessary for foundation, leveling, alignment etc. All Foundation pockets of the<br />

Pump - Motor sets by suitable cement concrete mortar including supply of all<br />

required materials shall be within the scope of this job. All false works, staging etc.<br />

as would be necessary for proper erection shall be arranged by the contractor & the<br />

same shall be removed after erection works including mending of all damages good<br />

in the civil structure. It shall be mandatory to the contractor to arrange for technical<br />

supervision of pump manufacture during erection process of the pumping sets &<br />

furnish a certificate from the pump manufacturer to the effect that the pump motor<br />

sets have been erected to their satisfaction & technical need of the pump motors for<br />

giving desired performances have been fulfilled.<br />

After completion of the erection works, the equipments have to pass through the<br />

statutory & pre-commissioning tests & the contractor shall arrange the same at his<br />

own cost.<br />

Electrical power shall be provided thereafter by the employer for connection at the<br />

incomer of the HT/L.T Panel Board.<br />

DTS : Detailed Tender Specification. Page 207