1.27 Filling in holes and trenches etc.<br />

The Contractor immediately upon completion of the Works shall fill up holes and<br />

trenches which may have been made or dug, level the mounds, or heaps or earth<br />

that may have been raised or made, and clear away all rubbish which may have<br />

become superfluous or have been occasioned or made in the execution of the works,<br />

and the Contractor shall bear and pay all costs, charges etc.<br />

1.28 Accidents.<br />

It shall be the duty of the Contractor to arrange for the execution of the works in<br />

such a manner as to avoid the possibility of the accidents to persons or damage to<br />

the properties at any state of the progress of work. Nevertheless he shall be held<br />

wholly responsible for any injury or damage to persons and properties, which may<br />

occur irrespective of any precautions he may take during the execution of the<br />

works. The Contractor shall make good all claims and loss arising out of such<br />

accidents and indemnify the Employer from all such claims and expenses on<br />

account thereof.<br />

1.29 Water and lighting.<br />

The Contractor shall pay all fees and provide water and light as required from<br />

Municipal mains or other sources and shall pay all charges, thereof (including<br />

storage tanks, meters etc.) for the use of the works and workmen, unless otherwise<br />

specified elsewhere in these documents or arranged and decided on by writing with<br />

Engineer. The water used for the works shall be free from earthy vegetable or<br />

organic matter and from salts or other substances likely to interfere with the setting<br />

of mortar or otherwise prove harmful to the work and conform to relevant<br />

standards.<br />

1.30 Payment to labourers.<br />

The Contractor should note, that in the event of emergency, he shall pay all<br />

labourers every day. The Contractor shall not employ any labourer below age of 15<br />

years.<br />

1.31 Equivalence of standards and codes.<br />

Whenever reference is made in the contract to the respective standards and codes in<br />

accordance with which plant, equipment or materials are to be furnished and work<br />

is to be performed or tested the provisions of the latest current edition or revision of<br />

GTS : General Technical Specification. Page 18