Other acceptable standards like HIS/ISO etc. which may be equivalent and or<br />

superior to those specified above.<br />

Technical requirement of the vertical pumps for the specific system/project shall be<br />

guided by Data Specification sheets attached.<br />

In case of any contradiction between the above standards and data specification<br />

sheet the stipulations in the data sheets prevail and shall be binding on<br />

supplier/contractor.<br />

Design and Performance Requirement.<br />

The pump shall be of vertical wet pit type with mixed flow impeller. The pumps<br />

shall be placed vertically submerged within the intake well and mounted on the<br />

pump floor.<br />

The present pump battery shall contain 3 nos. pump sets of which 2 nos. in parallel<br />

operation shall deliver the required designed flow rate with additional 15% in<br />

excess of the station flow capacity of 8 MLD Water Treatment Plant at all the time<br />

for the present phase.<br />

In future 3 more pump sets shall be installed for additional Water Treatment Plant.<br />

Similar concept shall be followed for the future pump battery.<br />

Each pump battery (both for present and future) shall have separate common header<br />

but common Raw Water Rising Main.<br />

In the present phase, the minimum station flow shall be 480 m 3 /hr (133 lps) of raw<br />

water supply to be shared by 2 pumps working in parallel. The head demand at that<br />

condition shall be assessed by the <strong>Bid</strong>der considering the system stated to be<br />

encountered. The duty point head shall be considered at the declared lowest water<br />

level (LWL) of the Intake well as mentioned earlier. Individual pump TBH shall be<br />

calculated and furnished by the <strong>Bid</strong>der considering the above system.<br />

In future phase also the station flow shall be similar with 2 pumps working in<br />

parallel.<br />

The schedule of operation of pumps in the present phase may call for operation of<br />

single pump/two pumps continuously at all working level of the reservoir i.e. lowest<br />

W.L. Max. HWL and in between. The pumps shall be so selected that all the above<br />

mentioned duties are well within the safe operating zone of the pumps. Respective<br />

head and flow corresponding to the above operating levels shall be evaluated and<br />

furnished by the <strong>Bid</strong>der.<br />

DTS : Detailed Tender Specification. Page 188