The anchors provided at the mid-point between the two consecutive expansion joints,<br />

fixity points may be frame type in which case all the axial forces acting on the pipe<br />

line are carried by the frame consisting of one or more pair of supports and the pipe<br />

line, by shear and bending.<br />

Anchor blocks – Anchor blocks shall be designed in accordance with IS:5330-1984.<br />

18.14 System to be followed by the contractor for bringing the material<br />

from PHE store to work site.<br />

Whenever contractor is required to bring out any material from PHED store to work<br />

site for consumption as instructed by the Engineer In-Charge and as required in<br />

terms of the contract for execution of the work the following shall be followed.<br />

The contractor shall ensure to bring materials from PHED store to work site by<br />

using authorized gate pass issued by engineer in-charge and obtain one copy of gate<br />

pass from employer with full details of the materials. The contractor shall show the<br />

materials on the site to the engineer in-charge and get the gate pass counter signed<br />

immediately by engineer in-charge.<br />

The engineer/representative of the engineer is empowered to witness all activities<br />

related to fabrication, erection, testing and commissioning of all the items to be<br />

supplied.<br />

18.15 Inspection and testing.<br />

The Engineer-in-charge/Representative of the engineer-in-charge is empowered to<br />

witness all the activities related fabrication, erection, testing and commissioning. .<br />

Only inspected and approved materials are to be used for erection of pipe work.<br />

The completed pipe work be hydraulically tested as directed by the engineer incharge.<br />

The job deemed to be completed only on obtaining approval from Engineer-incharge.<br />

DTS : Detailed Tender Specification. Page 179