1.21 Existing services.<br />

Drains, pipes, cables, overhead electric wires and similar services encountered in<br />

the course of the works shall be guarded from injury by the Contractor at his own<br />

cost, so that they may continue in full and uninterrupted use to the satisfaction of<br />

the Employer and the Contractor shall not store materials or otherwise occupy any<br />

part of the ‘site’ in a manner likely to hinder the operation of such services. The<br />

Contractor must make good or bear the cost of making good, the damage done by<br />

him on any mains, pipes, cables or lines (whether above or below ground), whether<br />

shown or not shown in the drawings, without delay to the satisfaction of the<br />

Engineer and the Employer.<br />

1.22 Electric power supply.<br />

The Contractor is forewarned that there can be interruptions in power supply for<br />

reasons beyond the control of the State Electricity Board and therefore the<br />

contractor is advised to make his standby arrangement to provide and maintain all<br />

essential power supply for his work area at his expense. The contractor shall not be<br />

entitled to any compensation for any loss or damage to his machinery or any<br />

equipment or any consequential loss in progress of work and idle labour as a result<br />

of any interruptions in Power supply.<br />

1.23 Notice to telephone & electricity supply under taking.<br />

Before commencing operations, the contractor has to obtain permission from State<br />

PWD when he wants to cut any section of the road. The employer will give<br />

necessary assistance such as sending letters and attending meetings if required. The<br />

employer will also pay necessary charges towards restoration of roads to the State<br />

Highways and National Highways. Any delay in getting the permission from the<br />

State PWD, Electricity Board, BSNL Telecom Department, Traffic Department<br />

attached to the police and other departments for carrying out the work will be to the<br />

account of contractor.<br />

The contractor before taking up operations, which involve cutting of roads, shifting<br />

utilities etc., during the progress of the work, shall give notice to the concerned<br />

authorities viz. State PWD, Electricity Board, Telecom Department, Traffic<br />

Department attached to the police and other departments as may be affected by the<br />

work. The notice should identify the specific details so that the necessary diversion<br />

of traffic may be arranged and permissions obtained. The contractor shall<br />

co-operate with the department concerned and provide for necessary barricading of<br />

GTS : General Technical Specification. Page 16