(b) Pressurization : Each valved section of pipe shall be filled with water slowly and the<br />
specified test pressure, based on the elevation of lowest point of the linear section<br />
under test and corrected to the elevation of the test gauge, shall be applied by means of<br />
a pump connected to the pipe in manner satisfactory to the Engineer-in-charge.<br />
(c) Examination under pressure : Under the test pressure no leak or sweating shall be<br />
visible at all section of pipes, fittings, valves, hydrants and welded joints. Any<br />
defective pipes, fittings, valves or hydrants discovered in consequence of this pressure<br />
test shall be removed and replaced by sound materials and the test shall be repeated<br />
until satisfactory to the Engineer-in-charge.<br />
18.11 Wrapping & Coatings.<br />
The wrapping and coating for buried portion of pipeline shall be as per AWWA-C-<br />
203 and as indicated below.<br />
One coat of Shalimar/eq. plasticized coal tar primer cold application.<br />
A hot flood coat of plasticized coal tar with inner wrap at fiber glass resin polyester<br />
tissue followed by a second flood coat of hot coating of plasticized coal tar with outer<br />
wrap of fiber glass resin polyester tissue.<br />
The total thickness of both coating will not be less than 4.5 mm.<br />
Alternately protective coating and wrapping by tapes as per IS 10221 tapping shall<br />
be provided. Total thickness shall not be less than 4 mm, number of layers shall be<br />
minimum 7, thickness of centre cone in microns shall be 90, material of tape<br />
polyester reinforcement, softening point not less than 90 deg, penetration minimum<br />
4mm, pliability 5 deg, tensile strength not less than 160 N/sq. cm, test certificate for<br />
the tapes as per relevant codes shall be furnished.<br />
Where the pipe line is partly above ground and partly underground, the coating use on<br />
the buried portion should be continued well clear of the ground.<br />
Internal painting – The inside of the pipes should be protected against corrosion by the<br />
use of internal painting.<br />
18.12 Flushing and disinfection of mains before commissioning:<br />
The mains intended for potable water supplied should be disinfected before<br />
commissioning them for use.<br />
Distribution system chlorination of new mains : Special care should be taken to ensure<br />
disinfection of new mains. Among possible sources of contamination are sewer<br />
drainage, contaminated soil in the trench, contamination from workmen or their<br />
equipment or both and unavoidable foreign material present in the trench during<br />
construction.<br />
DTS : Detailed Tender Specification. Page 176