1.16 Conservation water.<br />

Special Conditions<br />

The Contractor shall make his own arrangement for the fresh water required for<br />

construction of civil works and testing of pipeline and hydraulic structures as well<br />

as for the potable water required for his labour camps.<br />

1.17 Construction power.<br />

When supply of electrical energy is not possible for any reason the Contractor shall<br />

make his own arrangement for supply of electrical energy required at his sites and<br />

the works.<br />

1.18 Temporary fencing.<br />

The Contractor shall, at his own expense, erect and maintain in good condition<br />

temporary fences and gates along the boundaries of the areas assigned, if any, to<br />

him by the employer for the purpose of the execution of the works.<br />

The Contractor shall, except when authorised by the Engineer, confine his men,<br />

materials and plant within the site of which he is given possession. The Contractor<br />

shall not use any part of the site for purposes not connected with the works unless<br />

prior written consent of the Engineer has been obtained. Access shall be made to<br />

such areas only by way of approved gateways.<br />

1.19 Sanitary facilities.<br />

The Contractor shall provide and maintain in clean and sanitary condition adequate<br />

W.C.’s and wash places, which may be required on the various parts of the site or<br />

use of his employees, to the satisfaction of the Engineer. The Contractor shall make<br />

all arrangements for the disposal of sewage of drainage in accordance with the<br />

directions of the Engineer.<br />

1.20 Restricted entry to site.<br />

The Contractor shall get the prior permission of the Engineer before any person not<br />

directly connected with the works to visit the site.<br />

GTS : General Technical Specification. Page 15