vi) Avoidance of sudden change in the direction of flow by provision of a stilling<br />

chamber to reduce the velocity gradually to about 0.3 m/s near the suction bellmouth.<br />

v) Avoidance of dead spots by keeping rear clearance from the center line of the<br />

pump.<br />

vi) Avoidance of mutual interference between two adjoining pumps by maintaining<br />

sufficiency clearance.<br />

(vii) Avoidance of dead spots at the suction bellmouth by maintaining the bottom<br />

clearance.<br />

viii) Provision for adequate submergence of the inlet of pump under the LWL, so as to<br />

prevent entry of air during draw down and to satisfy NPSHr.<br />

ix) Provision for overflow arrangement from the inlet stilling chamber.<br />

x) Provision for drainage system from both inlet and main chamber of the sump.<br />

xi) Provision for free board.<br />

17.5 Clear water pump house. For construction of pump house, the<br />

following factors are to be considered.<br />

i) The clear water pump house shall be rectangular and shall be constructed at the<br />

same level and adjacent to RCC sump. The floor of Pump House shall be designed for<br />

installation of 3 numbers of pumps, motors, delivery pipes, common header, valves and<br />

other electrical accessories, H.O.T. crane etc.. The pump floor and RCC beams shall be M-<br />

25 concrete and HYSD/TMT bars (Fe - 415). The walls of the Pump House shall be<br />

250mm thick 1 st class brickwork with 1:4 cement mortar (1 cement and 4 sand). Adequate<br />

numbers of RCC columns along the centre line of periphery of the circular brick wall and<br />

equally spaced for the support of 2 (two) nos. of Rolled Steel Joists (RSJ) and RCC Roof<br />

beams. The columns shall be constructed to support the RSJs over which HOT crane shall<br />

be fixed for lifting the Pumps, Motors, Pipes, Valves, and Electrical Accessories as well as<br />

to support RCC roof beams. The columns, bracings, Ties, Lintels, Chujja, RCC roof beams<br />

and roof slab shall be of RCC concrete of not leaner than M-25 and HYSD/TMT (Fe - 415)<br />

bars.<br />

ii) The availability of sufficient space between two adjoining pumps/motors.<br />

iii) Provision of sufficient space for the control panels as per the Indian Electricity<br />

(I.E.) Rules.<br />

iv) Provision of service bay in the station with different space to accommodate<br />

overhauling and repairs of the largest equipment.<br />

v) Provision of a head room and material handling tackle with adequate clearance to<br />

lift the motor clear off the face of the coupling and also carry the motor to the service bay<br />

without interference with any other apparatus including adequate clearance to dismantle<br />

and lift the largest assembly.<br />

DTS : Detailed Technical Specification. Page 164