16.7 The reduced level at different points of intake well and<br />

reservoirs/dam.<br />

High flood level : 1577.00 m<br />

Crest Level of Dam : 1562.00m<br />

Minimum water level : 1562.00m<br />

Pumps floor level : 1585.60m<br />

Discharge gallery level : 1583.20m<br />

Centre line of upper level intake port opening : 1575.00m<br />

Centre line of middle level intake port opening : 1567.00m<br />

Centre line of lower level intake port opening : 1562.50m<br />

16.8 For design of intermediate stage RCC Sump. The following factors are<br />

to be considered.<br />

i) Intermediate stage RCC sump is proposed to be constructed at a distance of about<br />

750m from the intake well and pump house. The RCC sump shall collect water lifted by<br />

the intake well pumps and shall have a storage capacity of 839.75 KL.<br />

ii) Since the sump is designed for the ultimate requirement and that 6 nos. of pumps<br />

are proposed to be installed in the ultimate stage, the RCC sump shall be of twin circular<br />

type to facilitate placement of suction pipes for 6 pumps.<br />

iii) The sump shall be constructed at the same level with that of the pumps house and<br />

shall have a height of not less than 3.3m to ensure pumps are installed with positive<br />

suction. The well is to be constructed with RCC of M-25 grade concrete and HYSD/TMT<br />

bars for reinforcement.<br />

vi) Avoidance of sudden change in the direction of flow by provision of a stilling<br />

chamber to reduce the velocity gradually to about 0.3 m/s near the suction bellmouth.<br />

v) Avoidance of dead spots by keeping rear clearance from the center line of the<br />

pump.<br />

vi) Avoidance of mutual interference between two adjoining pumps by maintaining<br />

sufficiency clearance.<br />

(vii) Avoidance of dead spots at the suction bellmouth by maintaining the bottom<br />

clearance.<br />

viii) Provision for adequate submergence of the inlet of pump under the LWL, so as to<br />

prevent entry of air during draw down and to satisfy NPSHr.<br />

ix) Provision for overflow arrangement from the inlet stilling chamber.<br />

x) Provision for drainage system from both inlet and main chamber of the sump.<br />

xi) Provision for free board.<br />

DTS : Detailed Tender Specification. Page 161