During detailed engineering the contractor shall submit the following.<br />

a) All the drawings/data pertaining to selected models with improvements if any.<br />

This should necessarily include complete pump performance curve with.<br />

b) H-Q curves for complete range of impellers between minimum and maximum<br />

size of impellers and so efficiency curves super imposed on them, highlighting<br />

selected important diameter.<br />

c) Shaft Power - Q curve for complete range of impellers<br />

d) Efficiency - Q furze for Maximum impeller diameter and selected impeller<br />

diameter.<br />

e) NPSHR - Q curve for maximum, minimum and selected impeller diameters.<br />

f) Torque-speed curves of pump superimposed on motor curve corresponding to<br />

80%, 90%, 100% voltage.<br />

g) Test reports and other particulars, as required by the applicable clauses of this<br />

specification.<br />

Instruction Manuals:<br />

Instruction manual for erection.<br />

Instruction for pre-commissioning check up, operation, abnormal conditions,<br />

maintenance and repair.<br />

Write up on controls and interlocks provided.<br />

Recommended inspection points and periods of inspection.<br />

Schedule of preventive maintenance.<br />

Ordering information for all replaceable parts.<br />

Recommendations for types of lubricants, lubricating points, frequency of<br />

lubrication changing schedule.<br />

Site Inspection and Testing:<br />

The equipment delivered to the Site shall be examined by the Contractor to<br />

determine that it is in good condition and in conformance with the approved<br />

working drawings and certifications. All equipment shall be installed in strict<br />

conformance with the Specification and the manufacturer's instructions.<br />