It shall be the responsibility of the contractor to ensure his equipment interfaces<br />

with any existing equipment correctly. Any interfaces must not affect the integrity<br />

of the equipment, or invalidate any warranties or guarantees.<br />

Each component or assembly shall have been proven in service in a similar<br />

application and under conditions no less than those specified therein.<br />

The plant shall be compatible with the civil structure, when installed, with sufficient<br />

space for operator access and maintenance procedures.<br />

All materials shall be of the best commercial quality and free from any flaws,<br />

defects or imperfections.<br />

Materials shall be selected to eradicate or reduce corrosion to a minimum.<br />

Suitability to climatic condition<br />

All plant and materials used shall in all respects be suitable for the climatic conditions<br />

of the Mawphlang as detailed below.<br />

Maximum temperature : 24 o C<br />

Mean daily maximum temperature : 20° C<br />

Mean daily minimum temperature : 6° C<br />

Minimum temperature : (-) 5.6° C<br />

Mean annual rainfall : 3509 mm<br />

Maximum relative humidity : 100 %<br />

Attitude : 1858m<br />

In damp situations and wherever exposed to the weather, precautions shall be taken<br />

against corrosion of metal work, cable armour, conduit and the like.<br />

GTS : General Technical Specification. Page 138