Control at point of entry supply:<br />

There shall be a linked main switch gear with fuse on each live conductor of the<br />

supply mains at the point of entry. The wiring throughout the installation shall be<br />

such that there is no break in the neutral wire except in the form of a linked switch<br />

gear. The neutral shall also be distinctively marked. In this connection rule 33(2) of<br />

the Indian electricity Rules, 1956 shall also be referred.<br />

Installation of main switch gear:<br />

The main switch gear shall be installed as near as practicable to the termination of<br />

service line and shall be easily accessible without the use of any external aid.<br />

Indication identifying earthed neutral conductors:<br />

On the main switch gear, where the conductors include an earthed conductor of a<br />

two wire system or a conductor which is to be connected thereto, an indication of a<br />

permanent nature conductor. In this connection Rules 32(1) of the Indian<br />

Electricity Rules, 1956, shall be referred.<br />

Marking of apparatus:<br />

When a board is connected to voltage higher than 250 volts all the terminals or<br />

loads on the apparatus mounted on it shall be marked in the following colours to<br />

indicate the different poles of phases to which the apparatus or its different<br />

terminals may have been connected.<br />

AC Three Phase : Red, Blue and Yellow<br />

Neutral : Black<br />

When four wire three phase wiring is done, the neutral shall preferably be in one<br />

colour and the other wires in another colour.<br />

Where a board has more than one switch gear, each such switch gear shall be<br />

marked to indicate which section of the installation it controls. The main switch<br />

gear shall be marked as such. Where there is more than one main switch board in<br />

the building, each switch board shall be marked to indicate which section of the<br />

installation and building it controls.<br />

GTS : General Technical Specification. Page 123