16.08.2013 Views

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

15.17 Safety equipments to be provided.<br />

The contractor shall provide the following safety equipments as per IE rules,<br />

- Rubber mat conforming to relevant IS, in front of all the HT panel for their entire<br />

length - 1000m wide<br />

- Sufficient pairs of electrically tested rubber gloves. These are to be kept in a<br />

suitable wooden box.<br />

- A shock treatment instruction chart in Khasi and English duly framed as detailed<br />

in. The nearest medical facility available with phone number shall also be kept<br />

- First aid box containing full compliments of medicines for treatment of electrical<br />

burns in the main switch room<br />

- Adequate number of portable fire extinguishers of dry powder (store type) as per<br />

IS:2171 to suit the individual substation, pumping station requirement.<br />

- Adequate number of caution notices in Khasi and English shall be fixed<br />

permanently on the equipment to comply the requirement of IE rules<br />

- Safety posters for vigilance against electrical accidents.<br />

- Adequate number of fire buckets with MS angles stand<br />

- Round bottom fire buckets marked fire shall be provided in the HT sub stations.<br />

15.18 Lighting & Small Power (IS:1913, IS:1777, IS:1032 Part 5,<br />

IS:13383 Part 2).<br />

Definitions and Conventional Symbols:<br />

The definition of terms shall be in accordance with the Indian Standard Code of<br />

Practice for Electrical working installation except for the definition of a “Point”.<br />

The wiring and the equipments shall comply in all respects with the requirement of<br />

rule 50 and 51 of IE Rules/56 as amended from time to time. The wiring and other<br />

electrical equipments shall be suitable for trouble free operation at variation of<br />

voltage and frequency prescribed in IE rules.<br />

Pressure and Frequency:<br />

Pressure and frequency of supply all current consuming devices shall be suitable for<br />

the pressure and frequency of the supply to which these are to be connected and<br />

shall function at variation voltage and frequency as per IE rules.<br />

GTS : General Technical Specification. Page 120

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!