16.08.2013 Views

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Painting:<br />

The panels shall undergo chemical derusting, sand blasting, degreasing, pickling in<br />

acid bath and phosphatised as per IS:6005 and primed. The panels shall be<br />

thoroughly rinsed with clean water after phosphating, followed by final rinsing with<br />

dilute bichromate solution and oven drying. The phosphate coating shall be sealed<br />

by the application of two coats of ready mixed, stoving type zinc chromate primer.<br />

Two coats of finishing synthetic enamel paint shall be applied, each coat followed<br />

by stoving. The final finished thickness of the paint film on steel shall not be less<br />

than 100 microns and shall not be more than 150 microns. The colour for the<br />

finishing paint shall be bright battleship grey as per IS:5 (Shade No. 631). The<br />

finished painted appearance of panels shall present an aesthetically pleasing<br />

appearance free from dust and uneven surface.<br />

The paint shall withstand humid tropical climate, rain, etc. The paint shall not scale<br />

of or crinkle or removed by abrasion during normal handling.<br />

Sufficient quantity for touch-up paint shall be furnished for application at site.<br />

15.12 Motor Control Panel.<br />

The motor control panel shall have the following equipments.<br />

- Main switch fuse or MCB, MCCB with required capacity in case of 415V<br />

motor pumps sets.<br />

- ACB or suitable circuit breaker to suit the motor capacity and voltage in case<br />

of HT motor pump sets.<br />

- Motor starter - Auto transformer / Star Delta.<br />

- Contactors<br />

- Single phase preventor<br />

- Ammeter with selector switch<br />

- Voltmeter<br />

- Pilot lamps for indication<br />

- Trip Alarm<br />

- Stop push button<br />

- Start Push Button<br />

GTS : General Technical Specification. Page 111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!