16.08.2013 Views

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

15.9 Approval by fire insurance authority.<br />

The equipment supplied along with the accessories shall be those approved for use<br />

in Electrical installations by the Fire Sectional Committee, Central Regional<br />

Council of the Insurance Association of India.<br />

15.10 Conditions of operation.<br />

The equipment offered shall be suitable for continuous operation under high<br />

ambient temperature. Motors for outdoor installation shall be weather proof.<br />

The switch board shall not be exposed to moisture or corrosive gases.<br />

The Contractor shall submit layout drawings showing the location of switch board<br />

and other equipment proposed to be installed for the approval of Engineer.<br />

15.11 LT Supply.<br />

The contractor shall ascertain the availability of LT supply from MeSEB and to<br />

procure equipments accordingly.<br />

HT/LT Panel :<br />

The control panel or motor control panel shall normally have ACBs, MCCB and<br />

MCB as the case may be. The number of equipments and capacity of each<br />

equipment shall depend on the requirement of a particular pumping station. The<br />

Panel shall be made of 12 SWG (2.6mm) sheet steel for the front side and 14 SWG<br />

(2.0mm) sheet steel for bottom and other sides with powder coating for long life.<br />

Necessary neutral link block to be provided at required locations. These panels shall<br />

be front wired, front connected and provided with closing handles with ON and<br />

STOP mechanical indication having in built locking system so that back access<br />

would not be required for inspection and maintenance. The enclosure shall be dust<br />

and vermin proof type. Since the entry of cables of the panel is generally from the<br />

bottom, the cable gland supporting plate shall be mounted not less than 300 mm<br />

above the floor level.<br />

GTS : General Technical Specification. Page 107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!