Chapter – 15<br />

Electrical Works and Pumping Machineries<br />

15.1 Electrical & Machineries.<br />

General Specifications<br />

Following clauses specify General Electrical requirements and standard of<br />

workmanship for the equipment and installations. General Specification clauses<br />

shall apply where appropriate except where particularly redefined elsewhere.<br />

Electrical Wiring and installation of fittings.<br />

1. The materials used shall conform to the relevant I.S.S where applicable. The<br />

make and other details of materials to be used should be furnished along with the<br />

tender.<br />

2. Continuous earth connection are to be made with 14 SWG T.C. wire.<br />

3. The wiring work done shall be neat, true to line, level etc. and in such a way that<br />

it gives an impressive and aesthetic appearance to the building.<br />

4. The actual location and number of points for lights, fan powers plugs etc., may<br />

be altered at the time of execution by the Engineer.<br />

5. Entire wiring and cabling work should be done as per IE rules.<br />

6. Any damages or breakages, chipping etc., caused by the electrification works to<br />

the structures have to be rectified by the contractor at his cost of the satisfaction<br />

of the Engineer.<br />

7. The contractor has to test each and every point after completion of wiring to the<br />

entire satisfaction of the Engineer by taking temporary supply from the existing<br />

service.<br />

GTS : General Technical Specification. Page 103