Preparation:<br />

The air valves and the isolating valves shall be examined before laying for cracks<br />

and other flaws. Only undamaged air valve shall be used. The air valves shall be<br />

opened and shaken for the air opening below the vulcanite balls on the bronze seats<br />

of the balls before fixing. All grid and foreign material shall be removed from the<br />

inside before placing. The flanged face shall be thoroughly cleaned and coated with<br />

a thin layer of mineral grease. In case of screw down type, the threads shall not be<br />

in damaged condition.<br />

Jointing Materials:<br />

The contractor shall provide all the necessary jointing materials, such as nuts, bolts,<br />

rubber packing, white zinc jute, lead wool etc. at his cost. All tools and plant<br />

required for installation of air valve shall be provided by the contractor at his cost.<br />

All the jointing materials shall be got approved from Engineer in charge before use.<br />

The nuts and bolts shall conform to IS: 1364 and the rubber packing shall conform<br />

to IS: 638.<br />

Installation:<br />

The air valves shall be fixed on a branched flange Tee on the main pipeline. The air<br />

valve and isolating sluice valve shall be housed in a chamber.<br />

Testing:<br />

The specification pertaining to sluice valve shall also apply to air valves.<br />

13.3 Fixing of C.I. M.H. Frame and cover in RCC Slab.<br />

General:<br />

The specification includes all requirements of fixing C.I. M.H. frame and cover of<br />

specified size and weight in the RCC slab with locking arrangement. For fixing the<br />

C.I. M.H. frame and cover of specified size and weight, the frame shall be fixed<br />

generally at the time of casting RCC slab with proper anchoring.<br />