0.1% Cu, 99 g/t Ag <strong>and</strong> 0.3 g/t Au.<br />

Probable ore brought total reserves up<br />

to 10.67 Mt. That compares with 3.63<br />

Mt of reserves at the beginning of 2005.<br />

Total resources were also increased, from<br />

11.08 Mt in January, 2005 to 13.22 Mt.<br />

This should be sufficient to add another<br />

15-20 years to mine life.<br />

These quantities should increase<br />

further when portions of the orebodies<br />

at Kaspersbo (from 1,000 m down to<br />

1,300 m), Lappberget (500–800 m <strong>and</strong><br />

1,100–1,400 m), Dammsjön (500–785<br />

m <strong>and</strong> 925–1,100m), <strong>and</strong> a smaller section<br />

at Tyskgården are included in the<br />

reserves figures. Kvarnberget is yet to<br />

be added, <strong>and</strong> Boliden is also exploring<br />

to the north of the Gransjön where the<br />

property extends for several kilometres.<br />

Sublevel stoping at<br />

lappberget<br />

The geological <strong>and</strong> geotechnical characteristics<br />

of significant portions of the<br />

newly-discovered orebodies allow mi-<br />

ning using more productive longhole<br />

methods instead of cut-<strong>and</strong>-fill. Lappberget<br />

ore, for instance, can be 60 m-wide<br />

through considerable vertical distances,<br />

<strong>and</strong> has proved to be suitable for sublevel<br />

stoping using a system of primary<br />

<strong>and</strong> secondary stopes progressing upwards.<br />

Primary stopes are 15 m-wide<br />

<strong>and</strong> 40 m-high <strong>and</strong> filled with paste<br />

made from concentrator tailings mixed<br />

with about 5% cement. The 20 m-wide<br />

secondary stopes are filled with development<br />

muck without cement. High pre-<br />

cision drilling is necessary to get optimum<br />

ore recovery <strong>and</strong> fragmentation.<br />

This mining method can possibly be<br />

used in parts of the Kaspersbo orebody,<br />

if rock quality is high enough. This will<br />

help with cost control, which is crucial<br />

for mining in Sweden. With Lappberget<br />

alone containing 5.46 Mt of the current<br />

reserves, grading over 7% zinc <strong>and</strong> 2.6%<br />

lead, plus silver <strong>and</strong> gold, it is no surprise<br />

that present development activities<br />

focus on using longhole-based production<br />

from these orebodies to raise total<br />

metal-in-concentrate output. Presently<br />

eight orebodies are being exploited.<br />

Garpenberg has generated a strategic<br />

plan for 2006–2019 allocating SEK 1<br />

billion for developing Lappberget. The<br />

overall programme includes: increasing<br />

Mined in<br />

“Central Zone”<br />

Possible<br />

sequence<br />

Sublevel stoping layout <strong>and</strong> mining sequence for Lappberget orebody.<br />

concentrator capacity to 1.2 Mt/y;<br />

designing <strong>and</strong> building a paste fill production/distribution<br />

system; <strong>and</strong> starting<br />

longhole drilling. This latter project<br />

involved rill mining in the Tyskgården<br />

orebody, followed by sublevel stoping<br />

in Lappberget.<br />

rill mining<br />

A special mining method known as rill<br />

mining has been developed for excavating<br />

the Tyskgården orebody. The orebody<br />

is relatively small, <strong>and</strong> large quantities<br />

garPenBerg, Sweden<br />

of development muck have to be accommodated<br />

underground as hoisting facilities<br />

are used for ore only.<br />

The method can be described as a<br />

modified sublevel stoping with successive<br />

back fill as mining is progressing.<br />

The 10 m-wide cut-off slots are drilled<br />

across the orebody using up-holes <strong>and</strong><br />

blasted in one single firing, starting from<br />

the centre. Seven 127 mm holes are left<br />

uncharged to provide sufficient expansion<br />

for the remaining 64 mm holes.<br />

After the slot has been opened, 70 de-<br />

grees up-holes fans consisting of eight,<br />

underground mining methods 49<br />

17.5 m<br />

Drawpoint<br />

spacing<br />

3 m<br />

3 9 4 10 5 11<br />

Development <strong>and</strong> primary stoping layout 1080 level.<br />

Primary stope:<br />

15 m wide x 40 m high<br />

Paste fill<br />

6<br />

896 Z<br />

916 Z<br />

956 Z<br />

Secondary stope:<br />

20 m wide x 40 m high<br />

Rock fill<br />

Note:<br />

How this hole must be designed to just<br />

miss the drift below to break properly<br />

996 Z