BarrOCa gr<strong>and</strong>e, POrTugal<br />

Scooptram ST600LP under maintenance.<br />

Crushed ore discharges onto the<br />

1,203 m-long, 17% inclined Santa Barbara<br />

conveyor belt that connects with a<br />

3,000 t-capacity coarse ore bin located<br />

beneath the mine office.<br />

Primary mine ventilation is provided<br />

naturally by several ventilation raises.<br />

Airflow is controlled by curtains in main<br />

areas <strong>and</strong> assisted by axial flow fans<br />

where needed, particularly in the stopes.<br />

Compressed air is needed for the<br />

charging of the blast holes with ANFO,<br />

Schematic of stope layout.<br />

Initial pillar Final pillars<br />

11 m<br />

5 m 3 m 5 m 3 m<br />

<strong>and</strong> a new compressor unit was installed<br />

underground in 2002.<br />

The mine is supplied by 3.0 kV electrical<br />

power, which is reduced to 380 V<br />

for distribution to equipment.<br />

<strong>Mining</strong> method<br />

The stoping process begins when spiral<br />

ramps are driven up to access the mineralized<br />

veins, <strong>and</strong> the orebody is opened<br />

in four directions <strong>and</strong> blocked out.<br />

Wolframite seam<br />

East-west oriented tunnels are called<br />

Drives, <strong>and</strong> those trending north-south<br />

are called Panels. Drives <strong>and</strong> Panels are<br />

driven 5 m-wide <strong>and</strong>, where they intersect,<br />

1.8 m-diameter raises are bored<br />

between haulage levels to act as orepasses<br />

for all of the stopes. Chutes are<br />

installed in the bottoms of the orepasses<br />

to facilitate the loading of trains.<br />

The height of the stopes is nominally<br />

2.1 m, but can increase to 2.3 m in areas<br />

where ore bearing veins are more variable<br />

in their dip, strike or thickness.<br />

Precise survey control is maintained,<br />

so that all final pillars are aligned vertically.<br />

Experience has shown that the<br />

stopes will usually begin to collapse<br />

about 4 or 5 months after extraction,<br />

which gives plenty of time to glean any<br />

remaining fines from the floor.<br />

Stope drilling is carried out by new<br />

generation Atlas Copco Rocket Boomer<br />

S1L low profile electric hydraulic single<br />

boom jumbos. Rounds are drilled 2.2<br />

m-deep, utilizing a Vee-cut, <strong>and</strong> 41 <strong>and</strong><br />

43 mm-diameter drill bits. Drilling is<br />

carried out on two shifts, with about<br />

28 holes required per 5 m-wide round.<br />

ANFO is loaded pneumatically into<br />

138 underground mining methods