Mining_Methods_UnderGround_Mining - Mining and Blasting
Mining_Methods_UnderGround_Mining - Mining and Blasting
Mining_Methods_UnderGround_Mining - Mining and Blasting
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ig, six hours/shift, two shifts/day. The<br />
Boomer 281 drills for one cycle each<br />
shift, with a 3 m advance, while the<br />
Simba H252 achieves 120-140 m/shift.<br />
By the end of 2006, annual production<br />
for the Simba H252 <strong>and</strong> Simba<br />
H254 was 60,000 m/rig, <strong>and</strong> the Simba<br />
H1354s were producing 72,000 m/rig.<br />
The capacity of the Boomer 281 was<br />
1,700 m of drifts, <strong>and</strong> 1,900 m for the<br />
Rocket Boomer 281, in faces 5 m-wide<br />
<strong>and</strong> 3.8 m-high.<br />
long partnership<br />
With more Atlas Copco equipment co-<br />
ming on stream, productivity will be<br />
successively increased to meet new,<br />
ambitious targets for the next phase of<br />
development.<br />
According to its plans for Phase Two,<br />
mining will proceed down to a level of<br />
-420 m, <strong>and</strong> annual output will be in-<br />
creased to 4.2 million t of ore. The distance<br />
between the levels will be also be<br />
increased, from 15 to 20 m.<br />
Through its long partnership with<br />
Atlas Copco, Meishan has also accumulated<br />
extensive experience of equipment<br />
management <strong>and</strong> maintenance, where<br />
the focus is on spot checks for cleanliness,<br />
lubricating, oil refilling, <strong>and</strong><br />
greasing. Atlas Copco service engineers<br />
provide technical support, assisting on<br />
scheduled maintenance <strong>and</strong> repairs, <strong>and</strong><br />
spare parts forecasting <strong>and</strong> stock planning.<br />
These combined efforts have led<br />
to equipment availability close to 100%.<br />
In addition, as Meishan is a showcase<br />
of Atlas Copco’s after sales service,<br />
training for other customers’ operators<br />
often takes place at this location.<br />
Excavation equipment managers at<br />
the mine state that, during more than<br />
10 years of working with Atlas Copco,<br />
they have been consistently provided<br />
Production <strong>and</strong> equipment build up at Meishan<br />
Control panel on Rocket Boomer 281.<br />
Simba production drill rig, one of six at Meishan.<br />
with equipment of correct design with<br />
flexibility in operation, low energy consumption,<br />
high reliability, low pollution<br />
<strong>and</strong> long service life.<br />
Excellent after sales service, <strong>and</strong> an<br />
abundant supply of spare parts, can now<br />
be taken for granted.<br />
nanJing, CHina<br />
acknowledgements<br />
Atlas Copco is grateful to the directors<br />
<strong>and</strong> management of Meishan Iron Ore<br />
Mine for their assistance in the produc-<br />
tion of this article, <strong>and</strong> to Baosteel Group<br />
Corporation for permission to publish.<br />
Year 1999 2000 2001 2002 2003 2004 2005<br />
Development cu m 100,315 109,149 109,536 129,600 115,200 126,770 312,510<br />
Number of drill rigs 4 4 4 5+1 backup 6+1 backup 6+1 backup 5+2 backup<br />
Output of iron ore (Mt) 2.84 3.18 3.33 3.46 3.87 4.00 3.91<br />
Drill metres (x1,000 ) 203 248 350 380 375 290 280<br />
Number of employees 1,640 1,540 1,500 1,420 1,460 1,420 1,410<br />
underground mining methods 117