13.08.2013 Views

Mining_Methods_UnderGround_Mining - Mining and Blasting

Mining_Methods_UnderGround_Mining - Mining and Blasting

Mining_Methods_UnderGround_Mining - Mining and Blasting

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ig, six hours/shift, two shifts/day. The<br />

Boomer 281 drills for one cycle each<br />

shift, with a 3 m advance, while the<br />

Simba H252 achieves 120-140 m/shift.<br />

By the end of 2006, annual production<br />

for the Simba H252 <strong>and</strong> Simba<br />

H254 was 60,000 m/rig, <strong>and</strong> the Simba<br />

H1354s were producing 72,000 m/rig.<br />

The capacity of the Boomer 281 was<br />

1,700 m of drifts, <strong>and</strong> 1,900 m for the<br />

Rocket Boomer 281, in faces 5 m-wide<br />

<strong>and</strong> 3.8 m-high.<br />

long partnership<br />

With more Atlas Copco equipment co-<br />

ming on stream, productivity will be<br />

successively increased to meet new,<br />

ambitious targets for the next phase of<br />

development.<br />

According to its plans for Phase Two,<br />

mining will proceed down to a level of<br />

-420 m, <strong>and</strong> annual output will be in-<br />

creased to 4.2 million t of ore. The distance<br />

between the levels will be also be<br />

increased, from 15 to 20 m.<br />

Through its long partnership with<br />

Atlas Copco, Meishan has also accumulated<br />

extensive experience of equipment<br />

management <strong>and</strong> maintenance, where<br />

the focus is on spot checks for cleanliness,<br />

lubricating, oil refilling, <strong>and</strong><br />

greasing. Atlas Copco service engineers<br />

provide technical support, assisting on<br />

scheduled maintenance <strong>and</strong> repairs, <strong>and</strong><br />

spare parts forecasting <strong>and</strong> stock planning.<br />

These combined efforts have led<br />

to equipment availability close to 100%.<br />

In addition, as Meishan is a showcase<br />

of Atlas Copco’s after sales service,<br />

training for other customers’ operators<br />

often takes place at this location.<br />

Excavation equipment managers at<br />

the mine state that, during more than<br />

10 years of working with Atlas Copco,<br />

they have been consistently provided<br />

Production <strong>and</strong> equipment build up at Meishan<br />

Control panel on Rocket Boomer 281.<br />

Simba production drill rig, one of six at Meishan.<br />

with equipment of correct design with<br />

flexibility in operation, low energy consumption,<br />

high reliability, low pollution<br />

<strong>and</strong> long service life.<br />

Excellent after sales service, <strong>and</strong> an<br />

abundant supply of spare parts, can now<br />

be taken for granted.<br />

nanJing, CHina<br />

acknowledgements<br />

Atlas Copco is grateful to the directors<br />

<strong>and</strong> management of Meishan Iron Ore<br />

Mine for their assistance in the produc-<br />

tion of this article, <strong>and</strong> to Baosteel Group<br />

Corporation for permission to publish.<br />

Year 1999 2000 2001 2002 2003 2004 2005<br />

Development cu m 100,315 109,149 109,536 129,600 115,200 126,770 312,510<br />

Number of drill rigs 4 4 4 5+1 backup 6+1 backup 6+1 backup 5+2 backup<br />

Output of iron ore (Mt) 2.84 3.18 3.33 3.46 3.87 4.00 3.91<br />

Drill metres (x1,000 ) 203 248 350 380 375 290 280<br />

Number of employees 1,640 1,540 1,500 1,420 1,460 1,420 1,410<br />

underground mining methods 117

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!