nanJing, CHina<br />

Wagner service truck doing the rounds of the mine.<br />

thickness of 292.50 m <strong>and</strong> a minimum<br />

thickness of 2.56 m, giving an average<br />

thickness of 134 m. The deposit is esti-<br />

mated to contain reserves of 260 million t<br />

of predominantly Fe 3 O 4 iron ore.<br />

The mine entrance is located 37 m<br />

above sea level (ASL), where the first<br />

phase of development got underway in<br />

1975, <strong>and</strong> the ore is currently mined at<br />

-243 m ASL.<br />

Idealized long section of mine.<br />

Southwest<br />

ventilation<br />

1# Main shaft 2# Main shaft<br />

+31.50 m +37 m<br />

–447 m<br />

development<br />

Phase One of the Meishan development<br />

plan comprised shaft development, underground<br />

stoping <strong>and</strong> sub-level caving.<br />

There are six shafts, three for hoisting<br />

(main, secondary <strong>and</strong> southwest), <strong>and</strong><br />

three for ventilation (south, southeast<br />

<strong>and</strong> west). The main ramp, built in<br />

2000, is connected at its lower end to<br />

RAMP<br />

Southeast<br />

ventilation<br />

+47 m<br />

–186 m<br />

–198 m<br />

the horizontal mining area at the -198<br />

m level. The mining process consists<br />

of development drifting, rock drilling<br />

for stoping, back-stoping <strong>and</strong> recovery,<br />

transportation, <strong>and</strong> ore hoisting, in which<br />

Meishan has pioneered the introduction<br />

of mechanization.<br />

In this respect, the mine has been<br />

working h<strong>and</strong> in h<strong>and</strong> with Atlas Copco.<br />

It installed its first Atlas Copco Simba<br />

H252 drill rig in April, 1993, <strong>and</strong> now<br />

operates 11 Atlas Copco rigs. Of these,<br />

three Simba H252, one Simba H254<br />

<strong>and</strong> two Simba H1354 rigs are used for<br />

production drilling, while four Boomer<br />

281 <strong>and</strong> one Rocket Boomer 281 are<br />

used in development. In addition, two<br />

Scooptram ST1020 loaders are employed<br />

on production.<br />

The Simba rigs drill 76 mm blast<br />

holes, while the Boomer rigs drill 76 mm<br />

cut holes <strong>and</strong> 48 mm blast holes. All<br />

drifting <strong>and</strong> medium-to-long hole dril-<br />

ling is carried out by Atlas Copco drilling<br />

rigs. This equipment has been instrumental<br />

in enabling Meishan to continuously<br />

improve its productivity <strong>and</strong><br />

efficiency, year on year.<br />

For example, from 1995 to present,<br />

the number of workers employed in drif-<br />

ting has been successively reduced from<br />

more than 500 to 160, <strong>and</strong> the number<br />

of miners has also diminished significantly.<br />

During the same period, productivity<br />

has been substantially increased<br />

(see table).<br />

Meishan is in operation approximately<br />

300 days/year, <strong>and</strong> drifting <strong>and</strong> mining<br />

teams comprise two men per drill<br />

North<br />

ventilation<br />

–198 m<br />

–213 m<br />

–228 m<br />

–243 m<br />

Shaft for<br />

personnel hoist<br />

116 underground mining methods<br />

–258 m<br />

–330 m