to the hanging wall. The fill used on<br />

site includes uncrushed underground<br />

development rock spoil, heavy media<br />

reject from the process plant, or hydraulic<br />

s<strong>and</strong> fill from the surface.<br />

The potential hazards of loading out<br />

from within an open stope have been<br />

tackled by technical development. With<br />

the benching method, teleremote production<br />

loading was also brought in.<br />

With this system, employing CCTV<br />

cameras on the front <strong>and</strong> back of the<br />

LHD, operators can now h<strong>and</strong>le up to<br />

three units by remote control from one<br />

location. This is an air-conditioned<br />

cabin, which may be up to 1 km away.<br />

The system saves time spent on a job,<br />

increases operator safety, <strong>and</strong> gives operators<br />

more control.<br />

The technology was practically ahead<br />

of its time when introduced, because<br />

it is still current. It was a step towards<br />

the development of today’s equipment<br />

with built-in navigational systems.<br />

Benching has increased productivity,<br />

improved safety, reduced costs <strong>and</strong><br />

provides better utilization of equipment.<br />

The extensive mine workings at Mount<br />

Isa incorporate a total length of under-<br />

ground openings including road-ways,<br />

19A<br />

17D<br />

18E<br />

19/L<br />

Huge savings in drilling consumables<br />

Atlas Copco Secoroc workshop at Mount Isa Mines.<br />

An alliance between MIM <strong>and</strong> Atlas<br />

Copco Secoroc has resulted in a reduc-<br />

tion of annual bit consumption from<br />

28,000 to just 11,000, with no changes<br />

in tonnages. For more than 15 years,<br />

Secoroc had held a supply-only con-<br />

tract for drilling consumables with<br />

MIM. When taking over the role of<br />

General Manager, they reviewed the<br />

contract <strong>and</strong> found a throw-away cul-<br />

ture that, if turned around, had the<br />

16B<br />

18B<br />

19C<br />

Tailor made stope design at Mount Isa copper mine.<br />

orepasses <strong>and</strong> shafts, of approximately<br />

975 km. The workings produce 10 mil-<br />

lion t/year. Most mines have at least one<br />

particular form of technical challenge,<br />

<strong>and</strong> at Mount Isa it is heat, due to the<br />

great working depths. The virgin rock<br />

temperatures are around 60 degrees C.<br />

MOunT iSa, auSTralia<br />

However, with proper ventilation the<br />

mine’s wet-bulb temperature is below<br />

23 degrees C. The Mount Isa ventilation<br />

system is one of the largest of its kind<br />

in the world, <strong>and</strong> includes bulk coolers<br />

on the surface to cool the air before it<br />

goes underground.<br />

underground mining methods 103<br />

19C<br />

18E<br />

potential to markedly save costs <strong>and</strong><br />

improve safety. The original consuma-<br />

bles contract was not providing enough<br />

information to the supplier. This reali-<br />

zation was instrumental in changing<br />

the contract from supply only, to full<br />

service <strong>and</strong> supply. MIM is a very large<br />

<strong>and</strong> busy company, making the focus<br />

on drilling consumables difficult.<br />

MIM undertook the task of generating<br />

information <strong>and</strong> sharing it with<br />

Secoroc, to release the mutual benefits<br />

of reduced costs for the client <strong>and</strong><br />

contract extensions for the supplier.<br />

To foster continuous improvement,<br />

quarterly meetings were implemented<br />

to discuss the provision of service<br />

– prompt reporting of loss, product<br />

training <strong>and</strong> product development.<br />

Both parties agree on what has <strong>and</strong><br />

what hasn’t been done, focusing on<br />

the objectives. As a result, Secoroc is<br />

able to provide the most suitable <strong>and</strong><br />

16B<br />

19/L<br />

Current practice in stope design<br />

Match stope outline with grade contour.<br />

Consider existing development horizontal<br />

& vertical (inaccessible).<br />

Design additional development as required<br />

for stope extraction.<br />

Use rock mechanics principles (pillars,<br />

exposure dimensions).<br />

Location & quality of faults & fill masses<br />

(delay exposure).<br />

Extraction options<br />

Simplify stope extraction sequence.<br />

Minimize remote mucking.<br />

Delay exposing faults <strong>and</strong> fill masses.<br />

Effective ventilation circuits.<br />

Safety considerations & hazard ID.<br />

Design -> Monitor operating<br />

cost-efficient products for MIM operations,<br />

resulting in fewer bits for the<br />

same tonnages. MIM <strong>and</strong> Secoroc are<br />

now really pushing the idea of reusing<br />

material <strong>and</strong> focusing on wastage. Bit<br />

resharpening, rod straightening <strong>and</strong><br />

rod clearing have been introduced with<br />

the resharpening ratio for development<br />

bits now averaging 1.5 times.<br />

Consumable care is an area where<br />

the jumbo operators can improve the<br />

life of consumables <strong>and</strong> cost per metre,<br />

<strong>and</strong> Secoroc is required to take a lead<br />

in education in the use of its products.<br />

The companies are working towards<br />

agreeing on <strong>and</strong> setting expectations<br />

about scaling st<strong>and</strong>ards, <strong>and</strong> procedures<br />

to reduce damage.<br />

The initial supply <strong>and</strong> service contract<br />

ran for one year <strong>and</strong> has since<br />

been extended for three years on a performance-based<br />

rolling contract, with<br />

three monthly performance reviews.