Table 3. <strong>Impact</strong> comparison matrix<br />

Topic Alternative 1 – No Action<br />

Geology and Soils • No disturbance of surface<br />

topography and soils on Sections<br />

9, 10, and 16.<br />

• No excavation within Westwater<br />

Canyon Formation, no extraction<br />

of uranium ore, and no backfilling<br />

of excavated spaces and<br />

rooms.<br />

• In sum, would have essentially<br />

no impacts on geology and soils<br />

at the RHR permit site.<br />

Alternative 2 – Proposed Action<br />

(Two-shaft alternative)<br />

• Hundreds of thousands to millions of cubic<br />

yards of ore and nonore rock would be<br />

mined and extracted over the life of the<br />

mine.<br />

• Permanent changes to the geologic<br />

character and structure of large volumes<br />

within the Westwater Canyon Member of<br />

the Morrison Formation.<br />

• Overall impacts to geology would be<br />

direct, long term, localized, moderate,<br />

probable, and of slight precedence or<br />

uniqueness.<br />

• <strong>Impact</strong>s on geology would be less than<br />

significant.<br />

• Direct, medium term to long term,<br />

localized adverse impacts on soils at mine<br />

site.<br />

• Placement of treated water (water reuse)<br />

pipeline would have negligible, short-term,<br />

localized effects on soils.<br />

• Upon completion of reclamation, soils<br />

should be stabilized sufficiently to support<br />

restoration of vegetation.<br />

• Disturbed soils would not recover 100<br />

percent of their predisturbance condition<br />

<strong>for</strong> centuries.<br />

• In conclusion, impacts on both geology<br />

and soils would be less than significant.<br />

Chapter 2. Alternatives, Including the Proposed Action<br />

Alternative 3 – One-shaft<br />

Alternative<br />

• <strong>Impact</strong>s on geology very similar to<br />

alternative 2’s impacts.<br />

• <strong>Impact</strong>s on geology would be less than<br />

significant.<br />

• <strong>Impact</strong>s on soils of a similar nature to<br />

those of alternative 2, but reduced in scale.<br />

• Alternative 3 reduces alternative 2’s area<br />

of surface disturbance overall by 29%; 155<br />

acres vs 218 acres.<br />

• Alternative 3 has a lower potential to<br />

disturb soils than alternative 2.<br />

• In sum, impacts on soils would be less than<br />

significant.<br />

DEIS <strong>for</strong> <strong>Roca</strong> <strong>Honda</strong> <strong>Mine</strong>, Cibola National Forest 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!