Chapter 2. Alternatives, Including the Proposed Action<br />

Drill pads are proposed to be constructed to support development drilling and monitoring well<br />

construction. Development drilling requires short-term use of the surface, including a 150-by-<br />

150-foot area <strong>for</strong> drill rig operations, and access roads <strong>for</strong> transportation of the drill rig and other<br />

support equipment. RHR proposes to construct up to12 drill pads to support development drilling.<br />

The majority of these drill pads would be located in the southern half of Section 16, with<br />

additional drill pads proposed <strong>for</strong> the northern half of Section 16 and the southeast corner of<br />

Section 10. Some drill pads would also be necessary <strong>for</strong> constructing monitoring wells.<br />

Monitoring wells are used to monitor and test groundwater conditions. <strong>Roca</strong> <strong>Honda</strong> proposes to<br />

construct two monitoring wells in the south half of Section 9 and one in the southeast quarter of<br />

Section 10. Temporary access roads in Section 16, 9, and 10 are proposed to provide access to the<br />

drill pads. Those drill holes converted to water monitoring wells would have road access <strong>for</strong> the<br />

duration of the mine.<br />

Utility lines, pipelines, storm water control facilities, and fencing are also proposed. These<br />

facilities would be constructed primarily in the northern half of Section 16 and the southeastern<br />

quarter of Section 10. Storm water control facilities include water conveyances and storm water<br />

management structures designed to mitigate potential nonpoint-source water pollution that could<br />

be generated at the site.<br />

Figures 16-19 depict the layout of all major surface facilities associated with the <strong>Roca</strong> <strong>Honda</strong><br />

<strong>Mine</strong>.<br />

Additional Construction Commitments<br />

RHR has made the following additional commitments to reduce potential impacts to cultural<br />

resources in the permit area.<br />

1. Roads – Upon receipt of the necessary permits to allow start of construction, the first<br />

activity conducted by RHR would be to blade new access roads within the proposed haul<br />

road routes. The new bladed roads would be the access used by all mine related vehicles,<br />

while the haul roads are constructed. The existing ranch roads in Sections 17 and 16, and<br />

the unauthorized two-track road in Section 11, would not be used <strong>for</strong> mine related<br />

activities. In Sections 9 and 10, new proposed access roads to vent shafts and dewatering<br />

wells would be established prior to drilling the shafts and wells.<br />

2. Section 16 Perimeter Fencing – Perimeter fencing in Section 16 would be installed at<br />

the beginning of construction activities in that section.<br />

3. Section 10 Perimeter Fencing – Perimeter fencing in Section 10 would be installed prior<br />

to the start of construction of the main mining cantonment area in that section.<br />

4. Well Pad Fencing and Erosion Control – For all water monitoring and dewatering<br />

wells, including those exploratory drill locations turned into monitoring wells, the well<br />

pads would be fenced <strong>for</strong> the duration of their use, erosion control measures would be<br />

implemented around the pad, and a permanent access road to the well would be<br />

developed along the route shown on the project maps.<br />

5. Haul Road Gate – In Section 11, where Forest Road 192 and the proposed haul road<br />

diverge, a gate will be installed across the mine’s haul road to discourage public use of<br />

the haul road.<br />

44 DEIS <strong>for</strong> <strong>Roca</strong> <strong>Honda</strong> <strong>Mine</strong>, Cibola National Forest

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!