0.6 miles of non-system road would be converted to National Forest System Road<br />
(NFSR) and approximately 2 miles of open system road would be closed (see Map 8 in<br />
Appendix A). The converted system road segment was identified as needed for current<br />
and future resource management access. The proposed road closures (approximately 2<br />
miles total) are in three separate segments and would protect wildlife values and prevent<br />
resource damage.<br />
An estimated 34 miles of road would be reconstructed which may include, but is not<br />
limited to, structural improvements, typically rolling dips or culverts, surface<br />
reconditioning or realignment. An additional 91 miles of road would require<br />
maintenance to complete proposed activities.<br />
Existing unauthorized roads that are used as temporary roads with the project would be<br />
closed after use as part of the timber operations. Remaining unauthorized roads not used<br />
for the proposed activities are already administratively closed and may be physically<br />
closed in the future when funds become available.<br />
Temporary roads may also be used to access portions of proposed treatments units. The<br />
intent after use for all temporary road construction is that they shall be closed or<br />
decommissioned during post resource management activities. Temporary roads utilize<br />
existing unauthorized roads or are constructed in locations approved by the Forest<br />
Service.<br />
The average road density for the Black Hills National Forest is 4.4 miles per square mile<br />
as shown in the Forest Plan (Phase II Amendment). The minor changes to the<br />
transportation system proposed in Alternative 2 do not result in an overall change to road<br />
density. A simple comparison of road densities for the Vestal project area is listed below<br />
in Table 48.<br />
Table 48. Road Mileage and Density by Alternative<br />
Existing Conditions/Alt.1 Alternative 2<br />
Miles Miles/Mile 2 Miles Miles/Mile 2<br />
Open Roads 42 0.6 41 0.6<br />
Seasonal Roads 35 0.5 35 0.5<br />
Closed Roads 48 0.7 50 0.7<br />
Total 125 1.8 126 1.8<br />
Cumulative Effects<br />
Alternative 1 – No Action<br />
Alternative 1 would have no direct or indirect effects; therefore no cumulative effects<br />
would occur.<br />
Alternative 2<br />
This alternative would not increase open road density for the project area. Therefore, no<br />
negative cumulative effects to open road density would occur.<br />
These activities along with the Vestal project have the potential for the following<br />
cumulative effects on the transportation system.<br />
145