Vestal <strong>Final</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Statement</strong> Chapter 3<br />

0.6 miles of non-system road would be converted to National Forest System Road<br />

(NFSR) and approximately 2 miles of open system road would be closed (see Map 8 in<br />

Appendix A). The converted system road segment was identified as needed for current<br />

and future resource management access. The proposed road closures (approximately 2<br />

miles total) are in three separate segments and would protect wildlife values and prevent<br />

resource damage.<br />

An estimated 34 miles of road would be reconstructed which may include, but is not<br />

limited to, structural improvements, typically rolling dips or culverts, surface<br />

reconditioning or realignment. An additional 91 miles of road would require<br />

maintenance to complete proposed activities.<br />

Existing unauthorized roads that are used as temporary roads with the project would be<br />

closed after use as part of the timber operations. Remaining unauthorized roads not used<br />

for the proposed activities are already administratively closed and may be physically<br />

closed in the future when funds become available.<br />

Temporary roads may also be used to access portions of proposed treatments units. The<br />

intent after use for all temporary road construction is that they shall be closed or<br />

decommissioned during post resource management activities. Temporary roads utilize<br />

existing unauthorized roads or are constructed in locations approved by the Forest<br />

Service.<br />

The average road density for the Black Hills National Forest is 4.4 miles per square mile<br />

as shown in the Forest Plan (Phase II Amendment). The minor changes to the<br />

transportation system proposed in Alternative 2 do not result in an overall change to road<br />

density. A simple comparison of road densities for the Vestal project area is listed below<br />

in Table 48.<br />

Table 48. Road Mileage and Density by Alternative<br />

Existing Conditions/Alt.1 Alternative 2<br />

Miles Miles/Mile 2 Miles Miles/Mile 2<br />

Open Roads 42 0.6 41 0.6<br />

Seasonal Roads 35 0.5 35 0.5<br />

Closed Roads 48 0.7 50 0.7<br />

Total 125 1.8 126 1.8<br />

Cumulative Effects<br />

Alternative 1 – No Action<br />

Alternative 1 would have no direct or indirect effects; therefore no cumulative effects<br />

would occur.<br />

Alternative 2<br />

This alternative would not increase open road density for the project area. Therefore, no<br />

negative cumulative effects to open road density would occur.<br />

These activities along with the Vestal project have the potential for the following<br />

cumulative effects on the transportation system.<br />

145