Vestal <strong>Final</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Statement</strong> Chapter 3<br />

Global positioning systems, aerial photos, and the forest road data base were used during<br />

the inventory process to correct any inconsistencies in the existing GIS and tabular data.<br />

To summarize, the transportation system within the Vestal project area is comprised of<br />

approximately 192 miles of existing roads. The breakdown of the existing transportation<br />

system is listed below in Table 46.<br />

Table 46. Existing Transportation System in the Vestal Area<br />

Length in Road Density<br />

Road System Classification Miles (Miles/Square Mile)<br />

County Roads 28 0.4<br />

National Forest System Roads 125 1.8<br />

Unauthorized Roads* 39* 0.6*<br />

Total 192 2.8<br />

*All unauthorized roads were administratively closed with the May 07, 2010 Record of Decision for the<br />

Forest Travel Management project.<br />

There are no motorized trails within the Vestal project area.<br />

Roads within the project area which are open to the public were designated by the May<br />

07, 2010 Record of Decision and later depicted on the December 1, 2010 Motor Vehicle<br />

Use Map (MVUM).<br />

The travel management designation of the National Forest System Roads within the<br />

project area and road density (miles of road per square mile) is depicted in Table 47<br />

below.<br />

Table 47. Travel Management Designation Miles and Density within the Vestal Area<br />

Length in Road Density<br />

Travel Management Designation<br />

Miles (Miles/Square Mile)<br />

Roads Closed to All, Yearlong 48 0.7<br />

Roads Open to Highway Legal Vehicles<br />

Only, Seasonal (May 15 to Dec 15)<br />

35 0.5<br />

Roads Open to Highway Legal Vehicles<br />

Only, Yearlong<br />

42 0.6<br />

Total 125 1.8<br />

<strong>Environmental</strong> Consequences<br />

Alternative 1<br />

Under Alternative 1 there would be no effects from a proposed action. There would be no<br />

change in the transportation system due to a proposed action. Scheduled annual and grid<br />

maintenance would continue as it has in the past. Road densities would remain the same<br />

under this alternative.<br />

Alternative 2<br />

This alternative proposes to utilize the existing transportation system to accomplish<br />

project activities. Approximately 0.1 mile of new system road would be constructed to<br />

gain access to an existing system road blocked by private property. Also, approximately<br />

144