Planned project<br />

«Energy efficient building block»<br />

including 2 ZTP in Zhulebino district<br />

• Modernization of 8 buildings: 7 dwelling houses (1059<br />

apartments) and kindergarten<br />

• Installation of <strong>heat</strong>ing substations including hot water blocks. In<br />

this way, the further possibility of liquidation of central <strong>heat</strong>ing<br />

stations (and local hot water pipe networks) is provided<br />

• Individual <strong>heat</strong> metering system is designed with automatic<br />

distance reading, so that entering the apartments is excluded