Planned project<br />
«Energy efficient building block»<br />
including 2 ZTP in Zhulebino district<br />
• Modernization of 8 buildings: 7 dwelling houses (1059<br />
apartments) and kindergarten<br />
• Installation of <strong>heat</strong>ing substations including hot water blocks. In<br />
this way, the further possibility of liquidation of central <strong>heat</strong>ing<br />
stations (and local hot water pipe networks) is provided<br />
• Individual <strong>heat</strong> metering system is designed with automatic<br />
distance reading, so that entering the apartments is excluded