13.08.2013 Views

„Danfoss”, heat cost allocators - DBDH

„Danfoss”, heat cost allocators - DBDH

„Danfoss”, heat cost allocators - DBDH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Conclusions:<br />

- Results of the projects confirm effectiveness of modernization scheme<br />

- If end-users are not motivated economically, the economical effect is only<br />

partial<br />

- Modernization in separate houses does not lead to the final saving of<br />

energy resources, as far as saved <strong>heat</strong>ing energy “flows” to the neighboring<br />

houses, connected to the same central station. Modernization has to be<br />

performed simultaneously in all houses, connected to the <strong>heat</strong>ing station.<br />

Necessary further steps:<br />

-Realization of Methodic of Individual billing of <strong>heat</strong>ing <strong>cost</strong>s in Moscow City<br />

Billing center – as soon as possible<br />

-Expansion of Heating modernization to the groups of buildings, connected<br />

to the same Central <strong>heat</strong>ing stations<br />

- Including of all-level <strong>heat</strong> control and metering arrangements to the new<br />

construction and renovation as mandatory

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!