13.08.2013 Views

„Danfoss”, heat cost allocators - DBDH

„Danfoss”, heat cost allocators - DBDH

„Danfoss”, heat cost allocators - DBDH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“Energy Efficient House” project<br />

in Basmanny District<br />

• Address: Denisovski lane, 22<br />

Type of house: new-built brick/monolith<br />

Number of apartments: 38. Most of the<br />

dwellers are subsidiants, moved from<br />

old emergency houses<br />

Heating system: two-pipe, vertical.<br />

Automatic <strong>heat</strong>ing substation, balancing<br />

valves and TRVs “Danfoss” installed<br />

according to the design project<br />

Additional equipment: radiator <strong>heat</strong> <strong>cost</strong><br />

<strong>allocators</strong> installed at the expense of DEZ<br />

Basmanny

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!