Heating Modernization<br />

of Dwelling Houses<br />

by the Concept of OOO “Danfoss”<br />

applying domestic and individual automatic control and<br />

metering of <strong>heat</strong> consumption


We accumulated big experience of application<br />

of our energy saving equipment<br />

(more than 5000 <strong>heat</strong>ing substations<br />

in different regions of Russia)<br />

Moscow<br />

Nerungri<br />

Khimki<br />

Surgut


Main idea of Danfoss concept:<br />

application of automatic control and metering of<br />

<strong>heat</strong>ing energy at the entrance of <strong>heat</strong>ing system<br />

to the house and in every apartment


Components of the problem:<br />

• Technical side<br />

(project design, supply and installation of<br />

equipment)<br />

• Organizational side (service of equipment,<br />

reading of the meters and billing of <strong>heat</strong>ing <strong>cost</strong>s)<br />

• Legislation and normative basis (Housing<br />

Codex, Order of Russian Government № 307<br />

«Rules of Accordance of Housing Services to<br />

the Citizens», Construction Norm (SNiP)<br />

“Heating, Ventilation and Air<br />

Condiioning”,regional legislation)


Necessary<br />

Technical Arrangements<br />

-Installation of compact block automated<br />

<strong>heat</strong>ing substation at the input of <strong>heat</strong>ing system to the<br />

house<br />

- Installation of domestic <strong>heat</strong> meter<br />

with separation of transit <strong>heat</strong>ing piping<br />

- Installation of balancing valves at every <strong>heat</strong>ing<br />

raiser and thermostatic valves at every radiator in<br />

every apartment<br />

- Installation of individual <strong>heat</strong> metering devices (<strong>heat</strong> <strong>cost</strong><br />

<strong>allocators</strong> on every radiator in the case of vertical piping or<br />

apartment <strong>heat</strong> meters in the case of horizontal piping)<br />

Combination of automatic control and metering at the entrance of<br />

the building and in every apartment gives maximal economic effect


Effect is achieved because of moving<br />

of control functions closer<br />

to the end-users and economical motivation<br />

of end-users<br />

Old scheme<br />

Modernized scheme<br />

TEZ, Heating Station<br />

ZTP, metering<br />

Uncontrolled input<br />

to the building,<br />

(sometimes metering)<br />

Apartment<br />

(no control and metering )<br />

TEZ, Heating Station<br />

ITP, metering<br />

Apartment<br />

(Thermostatic<br />

radiator valves,<br />

individual meters)


Benefits of complex <strong>heat</strong>ing<br />

modernization:<br />

Improvement of <strong>heat</strong>ing quality; possibility to keep comfortable<br />

temperature in apartments<br />

reduction of <strong>heat</strong> consumption by 25-40% (especially important<br />

because of expected energy deficit in many cities)<br />

saving of energy resources; possibility to export disengaged fuel<br />

reduction of <strong>heat</strong>ing bills of end-users, due to the possibility for<br />

them to influence on their payments<br />

reduction of social loading considering introduction of 100%<br />

payment for communal cervices and annual growth of tariffs


Projects in Russian Regions<br />

(new-built and existing houses)<br />

Penza,<br />

Chaadaeva str.<br />

107а<br />

Nerungri, Druzhby<br />

Narodov str., 6/2<br />

Saransk, Erkaya str., 14<br />

Hyagan, 3rd district, 20


Equipment in Apartments<br />

(Thermostatic Valves and<br />

Heat Cost Allocators INDIV-3)


Economical effect according<br />

to the results of “Danfoss” projects<br />

Changing from elevators to automatic substations, raiser balancing ~ 20-25%<br />

Installation of TRVs and individual metering ~ 15-20%<br />

Total average economical effect ~ 35-45%<br />

Reduction of <strong>heat</strong>ing payments for economical users up to 65%<br />

Capital investments per 1 square meter of the house ~ 150-300 RUR<br />

Payback period of modernization ~ 2-4,5 years<br />

Terms of life of equipment from 10 years (components of substations, meters) to<br />

30 years (TRVs)


Application in Moscow<br />

• June 2005 - Danfoss Concept was approved in Moscow<br />

City Duma<br />

•2005-2006 - realization of first 2 projects (Basmanny district<br />

and Zhulebino)<br />

•2006-2007 – monitoring of projects, planning of big-scale<br />

project «Energy Efficient Building Block» in Zhulebino<br />

• July - October 2007 – complex modernization of 2 dwelling<br />

houses in “Metrogorodok” district in cooperation with<br />

radiator production company “Santechprom” in the frames of<br />

City capital renovation program


“Energy Efficient House” project<br />

in Basmanny District<br />

• Address: Denisovski lane, 22<br />

Type of house: new-built brick/monolith<br />

Number of apartments: 38. Most of the<br />

dwellers are subsidiants, moved from<br />

old emergency houses<br />

Heating system: two-pipe, vertical.<br />

Automatic <strong>heat</strong>ing substation, balancing<br />

valves and TRVs “Danfoss” installed<br />

according to the design project<br />

Additional equipment: radiator <strong>heat</strong> <strong>cost</strong><br />

<strong>allocators</strong> installed at the expense of DEZ<br />

Basmanny


Heat consumption of experimental<br />

house during the season 2005-2006<br />

Economy result was 38% comparing to the normative and 5% comparing<br />

to design loading. Economy is higher in autumn and in spring<br />

90,0<br />

80,0<br />

70,0<br />

60,0<br />

50,0<br />

40,0<br />

30,0<br />

20,0<br />

10,0<br />

0,0<br />

октябрь<br />

ноябрь<br />

декабрь<br />

январь<br />

февраль<br />

март<br />

апрель<br />

май<br />

июнь<br />

июль<br />

август<br />

сентябрь<br />

Расч. Нагрузка,<br />

Гкал<br />

Факт (по общему<br />

счетчику), Гкал<br />

Норматив,<br />

распределение<br />

по месяцам, Гкал<br />

Average payment reduction was 2044 RUR for the year per one apartment


“Energy Efficient House” project<br />

in Zhulebino (South-East of Moscow)<br />

• Address: Zhulebinski boulv. 36- 2<br />

Type of house: panel, P- 46M series, 1996<br />

year of construction.<br />

Number of apartments: 82<br />

Heating system before modernization:<br />

one-pipe vertical, convectors “Universal”<br />

without TRVs and bypasses, connection<br />

to the external <strong>heat</strong>ing network through<br />

elevators<br />

Installed equipment: Automatic block<br />

substation, automatic balancing valves,<br />

thermostatic valves <strong>„Danfoss”</strong>, <strong>heat</strong> <strong>cost</strong><br />

<strong>allocators</strong>


Outside Temperature Sensor and<br />

Block Heating Substation in Experimental House


Modernization of convectors<br />

“Universal”<br />

Welding was performed outside of apartments - minimal<br />

discomfort for dwellers


Heating energy<br />

consumption, Gkal<br />

Comparing of actual measured <strong>heat</strong> consumption<br />

w ith design loading values for the period 11.2005 -<br />

04.2006<br />

350<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

0<br />

29%<br />

17%<br />

20% 23%<br />

33%<br />

Ноя Дек Янв Февр Март Апрель<br />

29%<br />

Факт<br />

Расч<br />

Reduction of <strong>heat</strong> consumption is 375,19 Gkal, calculated amount<br />

of saved <strong>cost</strong>s - 272 400 RUR


Consumption in %<br />

of design load<br />

110,0<br />

100,0<br />

Heat consumption in apartments in % of design <strong>heat</strong>ing load for the<br />

period December 05 - January 06<br />

90,0<br />

80,0<br />

70,0<br />

60,0<br />

50,0<br />

40,0<br />

30,0<br />

20,0<br />

10,0<br />

0,0<br />

Payments for design <strong>heat</strong>ing load (apartments without meters)<br />

Payments according to<br />

the meters<br />

0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 78 81<br />

Ap. number


Gkal<br />

1400<br />

"Energy Efficient House" in Zhulebino. Comparing of actual<br />

and normative consumption for the <strong>heat</strong>ing period 2006-2007<br />

( 30,7 % economy)<br />

1200<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

Окт Ноя Дек Янв Февр март апр<br />

Фактическое<br />

потребление<br />

Нормативное<br />

потребление


Consumption per square meter, Gkal<br />

0,30<br />

0,25<br />

0,20<br />

0,15<br />

0,10<br />

0,05<br />

0,00<br />

Comparing of actual consumption per 1 square meter in<br />

experimental house and neighbouring houses of the same<br />

typical series P-46M<br />

Normative<br />

Жулебинский<br />

бульв. 36-2<br />

Жулебинский<br />

бульв. 36-1<br />

ул. Ав. Миля 4-2 ул. Ген.<br />

Кузнецова 26-3<br />

Heat consumption in experimental house for the season 2005-2006 is 13% lower,<br />

than normative, while in the neighboring houses it is in average 19% higher than<br />

normative.


Complex <strong>heat</strong>ing modernization<br />

of two dwelling houses<br />

in “Metrogorodok” district<br />

(Otkrytoye Shosse, 27 -2 and.25-11)<br />

Heating substations (Producer – ZAO “Santechprom” on the base of Danfoss<br />

equipment


Complex <strong>heat</strong>ing modernization<br />

of two dwelling houses<br />

in “Metrogorodok” district<br />

(Otkrytoye Shosse, 27 -2 and.25-11)<br />

Automatic balancing valves at the<br />

raisers of two-pipe system<br />

Radiators “Santechprom BM”<br />

with Danfoss TRVs and HCA


Conclusions:<br />

- Results of the projects confirm effectiveness of modernization scheme<br />

- If end-users are not motivated economically, the economical effect is only<br />

partial<br />

- Modernization in separate houses does not lead to the final saving of<br />

energy resources, as far as saved <strong>heat</strong>ing energy “flows” to the neighboring<br />

houses, connected to the same central station. Modernization has to be<br />

performed simultaneously in all houses, connected to the <strong>heat</strong>ing station.<br />

Necessary further steps:<br />

-Realization of Methodic of Individual billing of <strong>heat</strong>ing <strong>cost</strong>s in Moscow City<br />

Billing center – as soon as possible<br />

-Expansion of Heating modernization to the groups of buildings, connected<br />

to the same Central <strong>heat</strong>ing stations<br />

- Including of all-level <strong>heat</strong> control and metering arrangements to the new<br />

construction and renovation as mandatory


Heat and Water metering System<br />

INDIV AMR with automatic<br />

distance reading<br />

• Data transmission: inside the house – by<br />

radio (frequency 868MHz), to the distant<br />

computer – through Ethernet or GSM<br />

• Individual <strong>heat</strong> metering provided by HCA<br />

with radio transmitter INDIV-3R or<br />

apartment <strong>heat</strong> meters<br />

• Water metering – with pulse apartment<br />

water meters + pulse adapter INDIV PAD<br />

• possibility of integration of gas and<br />

electricity apartment meters


Planned project<br />

«Energy efficient building block»<br />

including 2 ZTP in Zhulebino district<br />

• Modernization of 8 buildings: 7 dwelling houses (1059<br />

apartments) and kindergarten<br />

• Installation of <strong>heat</strong>ing substations including hot water blocks. In<br />

this way, the further possibility of liquidation of central <strong>heat</strong>ing<br />

stations (and local hot water pipe networks) is provided<br />

• Individual <strong>heat</strong> metering system is designed with automatic<br />

distance reading, so that entering the apartments is excluded


Old (traditional) <strong>heat</strong> supplying scheme: 5 pipes


Modernized <strong>heat</strong> supplying scheme (3 pipes).<br />

Heat losses are reduced


New Normative Document<br />

AVOK Standard<br />

Heat Cost Allocators for the Determination of<br />

Consumption of Room Heating Radiators.<br />

Allocators with Electrical Energy Supply<br />

Standard is a structurally modified version of<br />

European Standard EN 834:1994<br />

«Heat <strong>cost</strong> <strong>allocators</strong> for the determination of the consumption<br />

of room <strong>heat</strong>ing radiators. Appliances with electrical energy<br />

supply»


Destination<br />

of new Standard<br />

For the producers of <strong>heat</strong> metering devices: standard<br />

defines demands to the construction, technical and functional<br />

characteristics of HCA, and corresponding necessary testing<br />

procedures<br />

For Consumers: Standard provides possibility to get<br />

guarantees of quality and safety of metering devices, produced<br />

and tested according to the Standard<br />

For service companies: Standard gives general<br />

recommendations of correct mounting of HCA and application of<br />

radiator coefficients in billing procedures in order to get correct<br />

<strong>heat</strong>ing bills


“Danfoss” proposals to the<br />

City Administration of Voronezh:<br />

Cooperate realization of <strong>heat</strong>ing modernization<br />

program in the city housing economy<br />

• I stage: realization of pilot project at one or several building<br />

groups, connected to the common central <strong>heat</strong>ing stations<br />

( “Danfoss” provides: technical support, training of project<br />

design and installation companies, supply of equipment, control<br />

of installation, support in organization of individual billing,<br />

information and promotion)<br />

• II stage: gradual transfer to mass-scale modernization


Detailed information about our equipment, application<br />

experience, legislation – at our site<br />

www.<strong>heat</strong>ing.danfoss.ru<br />

We kindly invite for cooperation<br />

in <strong>heat</strong>ing modernization of dwelling houses!<br />

Tel. (495) 792-57-57 ext. 231<br />

Fax (495) 540-73-64<br />

e-mail: nikitina@danfoss.ru<br />

Nikitina Svetlana<br />

Manager on Individual billing of Heating Costs<br />

of OOO “Danfoss”, Moscow

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!