12.08.2013 Views

Presenting PIANC

Presenting PIANC

Presenting PIANC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BRADDOCK LOCK AND DAM:<br />

INNOVATIONS IN DAM DESIGN<br />

Two 11,000-ton precast concrete<br />

float-in segments<br />

A unique two-stage cast and<br />

launch system for two segments<br />

Tow segments 27 miles to the<br />

site through two locks<br />

Unique positioning system<br />

installs the float-in segments<br />

onsite to a tolerance of 50 mm<br />

High performance underwater<br />

grouting and tremie concrete<br />

Pennsylvania, USA<br />

50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!