Greater New Orleans<br />

Hurricane and Storm Damage<br />

Risk Reduction System<br />

HSDRRS Closure Plan<br />

US Army Corps of Engineers<br />

BUILDING STRONG ®<br />

20 June 2012


HSDRRS Openings<br />

Total System Openings: 504<br />

Navigable Openings: 13<br />

Roadway Openings: 145<br />

Railroad Openings: 42<br />

Access Openings: 151<br />

Drainage Openings: 153<br />

•Approx 100 of these openings kept in the closed position<br />

•Data as of 31 May 2012<br />

2


Bayou Verret<br />

17 th St.<br />

Bayou Segnette<br />

Major Structure Utilizations<br />

Orleans<br />

Harvey Floodgate<br />

London<br />

Hero Canal<br />

3<br />

Seabrook<br />

<strong>West</strong> Closure Complex<br />

IHNC Surge Barrier<br />

Caernarvon


Major Structure Utilizations<br />

LPV<br />

17 th St Canal – USACE to close gates & utilize pumps<br />

Orleans Ave Canal – USACE to close gates & utilize pumps<br />

London Ave Canal – USACE to close gates & utilize pumps<br />

Seabrook – 3 total openings, under USACE direction<br />

contractor will close gates<br />

IHNC Surge Barrier – 3 total openings, USACE will close gates<br />

Caernarvon Sector Gate – USACE will close gates<br />

WBV<br />

Hero Canal Stoplog Gate – Under USACE direction contractor will<br />

close gate<br />

4<br />

Closure Count:<br />

<strong>West</strong> Closure Complex – 3 total openings. USACE will close gates &<br />

utilize pumps<br />

Harvey Floodgate – USACE to close gates & utilize pumps<br />

Bayou Segnette Complex – Under USACE direction contractor will<br />

close gates & utilize pumps<br />

Bayou Verret Sector Gate – USACE will close gates Closure Count:<br />

504<br />

487


Construction Closures & Interim Structures<br />

5


Construction Closures<br />

LPV<br />

LPV 09.2 – East side Duncan Pump Station there is a 40’construction access point. Closure<br />

consists of hescos deployed prior to a storm event.<br />

LPV 17.2 - There is a 33’ construction access point. Closure consists of a steel gate which is<br />

already on site and has been test fitted.<br />

WBV<br />

WBV 09c – Hwy 23 gate fix is being done on site and plan is to hang gate prior to a storm event.<br />

Back-up plan to use an engineered construction closure that consists of 127’ of hescos to be<br />

deployed as a storm event approaches in case issues arise with hanging the gate.<br />

WBV 73 – There is a 180’ construction gap remaining on the bypass lanes that will be closed by<br />

hescos that will be deployed as a storm event approaches.<br />

WBV 16b – There is a 65’ construction gap that will be closed with an engineered construction<br />

closure which consists of RIBS (Rapid Installation Barrier System) deployed prior to a storm<br />

event. Materials are on hand.<br />

WBV 16.2 – There is a 30’ construction gap will be closed with an engineered construction<br />

closure that consists of hescos prior to a storm event.<br />

6<br />

Closure Count:<br />

487<br />

Closure Count:<br />

481


Interim Structures<br />

LPV<br />

LPV 09.2 – Near Duncan Pump Station there is an 18’ gap and a 2’ gap. Closure consists of<br />

sheet pile and hescos that will be placed once the plan is approved.<br />

7<br />

Closure Count:<br />

LPV 104.01a – Buttressing work will develop and approximately 60’-70’ gap in the embankment<br />

adjacent to the floodwall. Closure plan (likely hescos) is being developed.<br />

LPV 104.02 – Buttressing work will develop and approximately 60’-70’ gap in the embankment<br />

adjacent to the floodwall. Closure plan (likely hescos) is being developed.<br />

LPV 144 – The Bayou Dupre gate is being fixed on site and the gate will be re-hung by mid July.<br />

ED is developing an interim structure for the 56’ gate opening that consists of installing an<br />

additional needle girder and extending the needles as a interim closure plan.<br />

WBV<br />

WBV 15b.2 – The interim structure consists of a combination of 100’ of sheet pile and 20’ of<br />

hescos.<br />

WBV 15a.2a – 530’ structural braced sheetpile interim structure.<br />

481<br />

Closure Count:<br />

475


Closure Monitoring (LIMS)<br />

8


Closure Monitoring (LIMS)<br />

9


Lake Pontchartrain and Vicinity<br />

Perimeter<br />

Orleans <strong>Levee</strong> <strong>District</strong> – 36 openings<br />

18 drainage valves, 16 roadway gates, 1 railroad gate, 1 navigable gate<br />

Lake Borgne <strong>Levee</strong> <strong>District</strong> – 15 openings<br />

12 access gates, 3 drainage valves<br />

East <strong>Jefferson</strong> <strong>Levee</strong> <strong>District</strong> – 8 openings<br />

4 roadway gates, 4 access gates<br />

Pontchartrain <strong>Levee</strong> <strong>District</strong> – 7 openings<br />

4 drainage structures, 2 roadway gates, 1 railroad gate<br />

USACE – 6 openings<br />

5 roadway gates, 1 railroad gate<br />

10<br />

Closure Count:<br />

475<br />

Closure Count:<br />

403


Lake Pontchartrain and Vicinity<br />

Outfall Canals Interior<br />

Orleans <strong>Levee</strong> <strong>District</strong> – 20 openings<br />

17 access gates, 3 railroad gates<br />

East <strong>Jefferson</strong> <strong>Levee</strong> <strong>District</strong> – 5 openings<br />

4 access gates, 1 railroad gate<br />

IHNC Interior<br />

11<br />

Closure Count:<br />

Orleans <strong>Levee</strong> <strong>District</strong> – 101 openings<br />

67 roadway gates, 16 drainage valves, 11 railroad gates, 6 access gates, 1 navigable gate<br />

403<br />

Closure Count:<br />

277


<strong>West</strong> Bank and Vicinity<br />

Perimeter<br />

USACE – 12 openings<br />

5 roadway gates, 3 access gates, 3 railroad gates, 1 drainage structure<br />

<strong>West</strong> <strong>Jefferson</strong> <strong>Levee</strong> <strong>District</strong> – 1 opening<br />

1 access gate<br />

Harvey/Algiers Interior<br />

<strong>West</strong> <strong>Jefferson</strong> <strong>Levee</strong> <strong>District</strong> – 69 openings<br />

37 access gates, 32 drainage valves<br />

USACE – 28 openings<br />

13 access openings, 8 drainage valves, 5 roadway gates, 2 railroad gates<br />

12<br />

Closure Count:<br />

277<br />

Closure Count:<br />

167


Mississippi River <strong>Levee</strong>s<br />

East Bank<br />

13<br />

Closure Count:<br />

Orleans <strong>Levee</strong> <strong>District</strong> – 138 openings<br />

64 drainage valves, 32 roadway gates, 26 access gates,16 railroad gates<br />

Lake Borgne <strong>Levee</strong> <strong>District</strong> – 9 openings<br />

5 roadway gates, 3 railroad gates, 1 access gate<br />

<strong>West</strong> Bank<br />

<strong>West</strong> <strong>Jefferson</strong> <strong>Levee</strong> <strong>District</strong> – 18 openings<br />

16 access gates, 2 roadway gates<br />

Algiers <strong>Levee</strong> <strong>District</strong> – 2 openings<br />

2 access gates<br />

167<br />

Closure Count:<br />

0


Regulated Navigation Area


2012 Hurricane Preparedness<br />

Preparedness Planning<br />

► Developing interim operating procedures for the IHNC and WCC basins<br />

► Managing construction closure plans for ongoing contracts, coordinating<br />

necessary closures with the local sponsors<br />

► Coordinating hurricane response plans with the local levee districts and the State<br />

► Updating a closure tracking system (LIMS) for all HSDRRS openings with SLFPA<br />

E&W and the State of LA<br />

Preparedness Exercises<br />

► 28 March - 4 April – Division Level Tabletop exercise<br />

• Simulation run from 6 days before through landfall<br />

• Designed to test key decision making and coordination<br />

► 10 May – <strong>District</strong> Level Tabletop Hurricane Exercise<br />

► 13-14 June – Hurricane Teams training<br />

► 18-19 June – <strong>District</strong> Full Hurricane Exercise including structure test closures<br />

► Ongoing tests at Outfall Canals, WCC, Seabrook and IHNC leading up<br />

to and throughout hurricane season<br />