Rajasthan State lndustrial.Development and lnvestment ... - RIICO
Rajasthan State lndustrial.Development and lnvestment ... - RIICO
Rajasthan State lndustrial.Development and lnvestment ... - RIICO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Rajasthan</strong> <strong>State</strong> <strong>lndustrial</strong>.<strong>Development</strong> <strong>and</strong> <strong>lnvestment</strong> Corporation Limited<br />
(A Govt. of <strong>Rajasthan</strong> Undertaking), Udyog Bhawan, Tilak Marg Jaipur 3O2OO5<br />
Website: www. riico.co.in<br />
EXPRESSION OF INTEREST<br />
<strong>Rajasthan</strong> state <strong>lndustrial</strong> <strong>Development</strong> <strong>and</strong> <strong>lnvestment</strong> corporation Limited (Rllco)<br />
invites Expression of lnterest from reputed environment consultants/ organisations with<br />
proven track record for carrying out following two works:<br />
.<br />
Area Specific Survey for preparing Action Plan for proper disposal of Marble<br />
Slurry by <strong>lndustrial</strong> units of Ajmer, Udaipur, Rajsam<strong>and</strong>, Kota, Chittorgarh,<br />
Jodhpur, Jalore & Sirohi districts.<br />
Area Specific Survey for preparing Action Plan for Dyeing & Printing lndustries of<br />
Bhilwara, Balotara, Bithuja, Jasol <strong>and</strong> Sanganer.<br />
lnterested parties shall express their interest by sending their responses in the<br />
prescribed format. The details can be downloaded from Rllco's web site:<br />
www.riico.co.in /ad-Eol/EoltL0220l3.pdf from 10.01.2013. The Eot should reach on or<br />
before 11.02.2013 by 17.00 hrs.<br />
Dt. 7th January, 2013<br />
osD (EM)
, RAJASTHAN STATE INDUSTRIAL DEVETOPMENT AND<br />
INVESTMENT CORPORATION t!MITED JA!PUR-3O2OO5<br />
Calling consulta nts/orga nizations for conducting Area Specific<br />
Survey for preparing Action Plan for proper disposal of Marble<br />
slurry by <strong>lndustrial</strong> units of Ajmer, Udaipur, Rajsam<strong>and</strong>, Kota,<br />
Chittorgarh, Jodhpur, Jalore <strong>and</strong> Sirohi districts.<br />
TECHNICAL BID<br />
osD (EM)<br />
<strong>RIICO</strong> Limited, Udyog Bhawan<br />
Tilak Marg, Jaipur - 302005<br />
RAJASTHAN
Technical Bid<br />
1. Proposal<br />
This proposal (EOl) envisages calling consu lta nts/organizations for conducting<br />
Area Specific Survey for preparing Action Plan for proper disposal of Marble<br />
slurry by <strong>lndustrial</strong> units of Ajmer, Udaipur, Rajsam<strong>and</strong>, Kota, Chittorgarh,<br />
Jodhpur, Jalore <strong>and</strong> Sirohi districts.<br />
2. Description of Work<br />
l. Background<br />
<strong>Rajasthan</strong> is famous for its marble deposits. There are around 4000 marble mines<br />
<strong>and</strong> about 1100 marble cutters in medium sector spread over the 16 districts of<br />
<strong>Rajasthan</strong>. Marble slurry is generated as a by-product during cutting of marble.<br />
The waste is approximately in the range of 20% of the total marble h<strong>and</strong>led. The<br />
amount of marble slurry generated in <strong>Rajasthan</strong> every year is very substantial<br />
being in the range of 5-6 million tonnes.<br />
The marble cutting industries are dumping the marble slurry in any nearby pit or<br />
vacant spaces, near their unit although notified areas have been marked for<br />
dumping. This leads to serious environmental <strong>and</strong> dust pollution <strong>and</strong> occupation<br />
ofvast area of l<strong>and</strong> especially after the slurry dries up. This also contaminates the<br />
underground water reserves.<br />
Similarly, makeover process of raw stone found from mines to usable high value<br />
products involves generation of power stone slurry. The huge amount of stone<br />
debris produced is normally dumped near the stone mines forming large number<br />
of artificial i.e. Ramganj-M<strong>and</strong>i area producing Kota stone.<br />
Since, early 1980 the Government of lndia is planning so many initiatives to<br />
encourage economical viable management of slurry waste management. Still<br />
these problems are existing in some of the cities of <strong>Rajasthan</strong>, namely<br />
Rajsam<strong>and</strong>, Udaipur, Chittorgarh, Kishangarh, Kota, Jodhpur, Jalore & Sirohi<br />
district etc. ln these cities lot of Marble/stone slurry is produced <strong>and</strong> discharged<br />
in an unplanned way, which is not only a threat to nearby environment but have<br />
very adverse effect on human health.<br />
Il. Need of Study<br />
Slurry from processing dimensional stones such as marble, granite <strong>and</strong> kota stone<br />
is generated in areas like Rajsam<strong>and</strong>, Kishangarh, Udaipur, Chittorgarh, Kota,<br />
Sirohi, Jodhpur <strong>and</strong> Jalore districts. The marble <strong>and</strong> kota stone are lime stone by
their chemical cha racteristics. The marble <strong>and</strong> kota stone varies in chemical<br />
composition from quarry to quarry <strong>and</strong> area to area. The slurry generated during<br />
cutting of these stones has moisture content more than 300%.<br />
This slurry is having environmental threat due to the reason that their bed is<br />
fairly impervious. This slurry when dry becomes mass of fine powder <strong>and</strong> carried<br />
by wind <strong>and</strong> is spread in the surrounding field. This reduces the permeabillty of<br />
soil <strong>and</strong> agricultural potential.<br />
The various options studied so far for its disposal are as under:<br />
i. Converting into building blocks<br />
ii. Using as sub base material in road construction<br />
iii. Using it as raw material in cement production<br />
iv. Chemical conversion to lime<br />
lll. Extent of Project Area<br />
Sustainable Marble Slurry Waste Management <strong>and</strong> disposal plan will be prepared<br />
for industrial areas of eight districts:<br />
i. Rajsam<strong>and</strong><br />
ii. Ajmer<br />
iii. Udaipur<br />
iv. Chittorgarh<br />
v. Kota<br />
vi. Sirohi<br />
vii. Jodhpur<br />
viii. Jalore<br />
lV. Objective<br />
The main objective of sustainable Marble Slurry Waste Management <strong>and</strong><br />
Disposal is to improve the quality of life <strong>and</strong> to protect the nearby environment<br />
in general <strong>and</strong> public health In particular.<br />
3. ELIGIBITITY AND qUALIFICATION REQUIREMENTS<br />
3.1 The EOI is open to all eligible consultants (bidder) as per invitation of Bid,<br />
3.2 MtNtMUM CR|TER|A FOR qUAUF|CATION<br />
a. The bidder should have at least 3 years experience of working in the field of<br />
environmental engineering.<br />
b. The bidder should have an experience in preparing detailed project report<br />
(DPR) for an engineering project for Government of lndia/<strong>State</strong> <strong>lndustrial</strong><br />
Nr, .
d.<br />
<strong>Development</strong> Corporation/ Private developer/<strong>State</strong> lndustries Department<br />
<strong>and</strong>/or MoEF/World Bank/ADB financed projects.<br />
The bidder must have satisfactorily completed <strong>and</strong> submitted at least one<br />
detailed project report during the last three years having consultancy<br />
charges of Rs. 30 lacs or more.<br />
The bidder in the same name <strong>and</strong> style should have achieved a financial<br />
turnover of Rs. 100.00 lacs during any one of the last three financial years<br />
(2009 -2010, 20 r0 -20 rt, 20tt- t2l.<br />
Note: Requisite certificates/stotements ore required to be enclosed with<br />
technicol bid document,<br />
4. CONTACT PERSONS<br />
For any queries following persons can be contacted:<br />
Sh. Ajay Gupta, Sr. Regional Manager, EM Cell, Jaipur, Ph:+91-9414047970<br />
Sh. Tarun Gupta, Astt. Regional Manager, EM Cell, Jaipur, Ph:+91-94L4047742<br />
The Technical <strong>and</strong> Financial bids are to be enclosed in two separate envelopes duly<br />
marked as Technical Bid & Financial Bid. Both these envelops are to be placed in<br />
covered envelop <strong>and</strong> submitted to OSD (EM), <strong>RIICO</strong> Ltd. upto 5.00 pm of 11,.02.2D13.<br />
The technical bid shall be opened on 73.O2.2073 at 70:3O am <strong>and</strong> Financial Bid of<br />
successful (technically qualified) bidders shall be opened on 5.03.2013 at 10:30 am in<br />
Room No. 4 (Ground Floor), <strong>RIICO</strong> Ltd. Udyog Bhawan, Tilak Marg, Jaipur<br />
Signature,<br />
Name & Address of<br />
Bidder with mobile<br />
number
RAJASTHAN STATE INDUSTRIAL DEVETOPMENT AND INVESTMENT<br />
coRPoRAT!ON LtMtTED, UDYOG BHAWAN, TITAK MARG, JAIpUR<br />
Calling consulta nts/organizations for conducting Area Specific<br />
Survev for drawing Action Plan for proper disposal of Marble<br />
slurrv bv <strong>lndustrial</strong> units of Aimer, Udaipur, Raisam<strong>and</strong>. Kota,<br />
Chittorgarh, Jodhpur, Jalore <strong>and</strong> Sirohi districts.<br />
FINANCIAT BID<br />
osD (EM)<br />
<strong>RIICO</strong> Limited, Udyog Bhawan<br />
Tilak Marg, Jaipur - 302005<br />
RAJASTHAN
RAJASTHAN<br />
Name of work:<br />
STATE INDUSTRIAT DEVELOPMENT AND INVESTMENT CORPORATION<br />
LIMITED, UDYOG BHAWAN, TILAK MARG, JAIPUR<br />
Calling consulta nts/organizations for conducting Area Specific<br />
Survey for preparing Action Plan for proper disposal of Marble<br />
slurry by industrial units of Ajmer, Udaipur, Rajsam<strong>and</strong>, Kota,<br />
Chittorgarh, Jodhpur, Jalore <strong>and</strong> Sirohi districts.<br />
Pa rticu la r Rate to be<br />
quoted by the<br />
bidder as<br />
complete job<br />
Stage l: Phase L: Preparation of M arble/Gra nite/Kota stone Slurry<br />
waste Management & Disposal Plan<br />
a) Literature review for effective utilization of marble slurry<br />
b) Reconnaissance Survey of Functional Element of Existing<br />
System<br />
c) Present Status of amount of marble slurry being utilized/<br />
reused <strong>and</strong> mode of this utilization/re use<br />
d) Quantity estimation of slurry generated area wise<br />
e) Material characterization: Chemical & Moisture content<br />
analysis<br />
f) Survey of related industries, queries & dlsposal site <strong>and</strong> its<br />
plotting on GIS platform <strong>and</strong> creating related attributes in the<br />
data base<br />
g) ldentification of present disposal method<br />
h) Stakeholder consultations with pHED, RSpCB, RltCO, District<br />
Administration, forest department, RSMML<br />
i) Study ofvarious option available for its disposal e.g. settling<br />
tanks, filter press, conversion into cake <strong>and</strong> end use as<br />
decided<br />
j) Economic analysis of various options<br />
k) Cost estimation of the selected options for utilization of slurry<br />
l) Compressive action plan<br />
m) Proposing implementation framework<br />
Stage l: Phase -2: Pilot Plant Study <strong>and</strong> Demonstration<br />
Stage ll: Project Structuring <strong>and</strong> PPP Option<br />
onlv (in Rs.
l. Final Output<br />
Following output shall be furnished by the consultant:<br />
a) lnception Report<br />
Brief description of purpose of the plan, methodology, background of the<br />
project area, physical condition of project area, existing waste management &<br />
disposal plan <strong>and</strong> further work plan.<br />
b) Draft Report<br />
Shortcoming in the existing system; quality <strong>and</strong> quantification of Marble slurry<br />
generated area wise; material characterization survey, survey & GIS plotting,<br />
identification of present disposal method, stakeholder consultation study of<br />
various option for lts end use, economic analysis of various options, cost<br />
estimation, project structuring <strong>and</strong> implementation framework.<br />
c) Final Report<br />
Waste Management plan after incorporating all suggestions <strong>and</strong><br />
recom mend ations.<br />
ll. Time Schedule of Completion of Tasks<br />
The following schedule s ute is ts to Io be reckoned n from om the date of ot award award.<br />
S. No. Task Schedule Time<br />
1. lnception Report 1.0 month<br />
Draft Report 4.0 month<br />
3 Final Report 6.0 month<br />
ll l. Payment Schedule<br />
Fixed Consultancy Fee:<br />
Consultancy Fee for services would be as per enclosed financial proposal <strong>and</strong><br />
shall be paid as follows:<br />
25% on submission of lnception Report<br />
50% on submission of Draft Report<br />
25% on submission of Final Report
lV. Terms <strong>and</strong> Conditions<br />
L. The Consultant is expected to^fave visited the site of work personally <strong>and</strong><br />
acquainted himself in respect/tKd scope of work <strong>and</strong> other relevant information<br />
related to the work before tendering for the work.<br />
2. The consultant shall bear all cost associated with the preparation <strong>and</strong> submission<br />
of the bid including any site visit <strong>and</strong> collection of data made for this purpose.<br />
3. All prices to be quoted by the bidders shall be inclusive of all taxes, duties, levies<br />
etc.<br />
4. Bid shall remain valid <strong>and</strong> open for acceptance for a period of 70 days after the<br />
date of Financial Bid opening.<br />
5. The tender rates must be legibly written in both figures <strong>and</strong> in words. Overwriting<br />
of the rates will not be entertained.<br />
5. All tender documents should be complete in all respect <strong>and</strong> bidders must return<br />
the documents containing detailed terms <strong>and</strong> conditions duly signed on each<br />
page.<br />
7. The work is to be completely finished to the satisfaction of the Engineer ln-Charge<br />
within ninety days from the date of written order to commence the work.<br />
8. The corporation reserves the right to accept/reject any or all of the tenders<br />
without assigning any reason what so ever <strong>and</strong> its decision will be final.<br />
9. No conditional offer will be accepted.<br />
10. Price quoted should be firm <strong>and</strong> without any escalation clause.<br />
L7. lt will be responsibility of the bidders to provide deploy any machinery/<br />
equipment/ instrument which may be required for the purpose of the job.<br />
12. ln case the agency/bidder(s) fails to do the above work at any stage then all<br />
amount released by the Corporation shall be recovered from the agency / bidders<br />
with forfeiting earnest money/ performance guarantee amount..<br />
13. Alternative bids will not be considered.<br />
14. All the conditions of the bid shall be accepted by the bidder.<br />
15. Also the clauses such as agreement, force majeure paying authority etc. as per<br />
general conditions of contract of Corporation shall be accepted.<br />
L6. The scope of work can be increased or decreased at the discretion of the<br />
Corporation.<br />
17. Bid documents are not transferable. Bids received from bidders in whose name<br />
the bid documents have been issued only shall be considered.<br />
18. The bidder shall submit an authorisation letter mentioning the name of its<br />
representative alongwith its attested signature for participation in the bid.<br />
79. The tender/bids containing any concealment of any information or wrong<br />
information will be liable to be rejected also liable to be debarred from tendering<br />
works in the Corporation for a specific period Signed<br />
/<br />
\S,
Note: 1.<br />
The rates are valid for a period of 70 days from the date of submission of<br />
bid.<br />
Note: l/we have gone through the scope of work <strong>and</strong> the rates have been quoted<br />
accordingly.<br />
l/we agree to execute the above work on quoted rates.<br />
Signature of bidder/consultant. with<br />
full address <strong>and</strong> contact number<br />
#A+,
RAJASTHAN STATE INDUSTRIAL DEVELOPMENT AND<br />
INVESTM ENT CORPORATION LIM ITED JAIPUR-3O2OO5<br />
Calling consultants/organizations for conducting area specific<br />
survey for preparing Action Plan for Dyeing & Printing lndustries<br />
of Bhilwara, Balotara, Bithuja, Jasol <strong>and</strong> Sanganer<br />
TECHNICAT BID<br />
osD (EM)<br />
<strong>RIICO</strong> Limited, Udyog Bhawan<br />
Tilak Marg, Jaipur - 302005<br />
RAJASTHAN
TechnicalBid<br />
1, Proposal<br />
This proposal (EOl) envisages calling consu lta nts/orga nizations for conducting<br />
Area Specific Survey for preparing Action Plan for Dyeing & printing lndustries of<br />
Bhilwara, Balotara, Bithuja, Jasol <strong>and</strong> Sanganer.<br />
2. Description of Work<br />
Background<br />
Dyes are extensively used in the textile industry. Due to high concentration of<br />
organics in the effluents <strong>and</strong> higher stability of modern synthetic dyes, their<br />
discharges into rivers are harmful. The textile dyeing <strong>and</strong> printing industry has<br />
been recognized as one of the most polluting industry in lndia causing the<br />
pollution of the water environment. The effluent of textile dyeing <strong>and</strong> printing<br />
industries contains high COD <strong>and</strong> colour. lt is observed that, the pollution<br />
potential of the printing industries is negligible as compared to that of textile<br />
dyeing industries.<br />
Environmental problems being encountered in Balotara, Bhilwara <strong>and</strong><br />
Sanganer etc are quite similar. Most of textile process related industries are<br />
located in the industrial complexes. All these industrial areas came to<br />
existence in nineteen seventies. lnitially industrial activity was quite low <strong>and</strong><br />
therefore polluted water discharged by them was not considered as an<br />
environmental threat. Also environmental awareness was quite low at that<br />
time. All these industrial areas have grown at a rapid pace <strong>and</strong> as a result the<br />
effluent discharged by them has become a severe environmental concern.<br />
Several Effluent Treatment Plants (ETPs) <strong>and</strong> Common Effluent Treatment<br />
plants (CETPs) have been installed in these industrial areas eventually with the<br />
several initiatives <strong>and</strong> incentives of Government, both <strong>State</strong> <strong>and</strong> Central, as<br />
well as with co-operation of local industrialists, still the environmental<br />
pollution caused by effluent discharged by units located in these areas is quite<br />
substantial <strong>and</strong> warrant an immediate attention. polluted effluent discharged<br />
from these areas is adversely affecting the farmers located on the<br />
downstream side, as evident from agitation by local farmers, who in some<br />
cases have resorted to legal action also.<br />
There have been several studies, carried out periodically, to study the<br />
pollution related problems <strong>and</strong> suggest suitable solutions. These studies have<br />
been initiated by Govt. agencies as well as by the associations/trusts of these<br />
industrialists. Based on recommendations of these studies, some common
effluent treatment plants have been established, as well as improvements in<br />
conveyance system have been carried out. All these measures at best can be<br />
described as ad-hoc solutions only. All these studies presented solutions to<br />
. the then existing pollution problems only, by way of increasing capacity of<br />
conveyance system <strong>and</strong> putting up of CETP. What is needed is an integrated<br />
approach leading to sustainable development which can be achieved by<br />
conserving the water through water recycling, adoption of waste<br />
minimization <strong>and</strong> other environmental friendly measures.<br />
ll. Objective<br />
The main objective of lntegrated <strong>lndustrial</strong> Wastewater Management plan<br />
(llWMP) is to improve the quality of life <strong>and</strong> to protect the nearby<br />
environment in general <strong>and</strong> public health in particular.<br />
lll. Extent of Project Area<br />
lntegrated Wastewater Management Plan (llWM P) will be prepared for textile<br />
dyeing <strong>and</strong> printing industries units of Bhilwara, Balotara, Sanganer, Bithuja &<br />
. Jasol ind ustria I areas..<br />
3. ELIGIBILIry AND qUALIFICATION REQUIREMENTS<br />
3.1 TheEOl is open to all eligible consultants (bidder) as per invitation of Bid.<br />
3.2 MTNTMUM CR|TER|A FOR qUAUF|CATION<br />
a. The bidder should have at least 3 years experience of working in the field of<br />
environmental engineering.<br />
b. The bidder should have an experience in preparing detailed project report<br />
(DPR) for an engineering project for Government of lndia/<strong>State</strong> <strong>lndustrial</strong><br />
<strong>Development</strong> Corporation/ Private developer/<strong>State</strong> lndustries Department<br />
<strong>and</strong>/or MoEF/World Bank/ADB financed projects.<br />
c. The bidder must have satisfactorily completed <strong>and</strong> submitted at least one<br />
. detailed project report during the last three years having consultancy<br />
charges of Rs. 30 lacs or more.<br />
d. The bidder in the same name <strong>and</strong> style should have achieved a financial I\I,<br />
turnover of Rs. 1OO.OO lacs during any one of the last three financial years I -.,'<br />
(2009 -20 10, 20L0 -20 rt, 207L-12l,.<br />
Note: Requisite certificotes/statements are required to be enclosed with<br />
technical bid document.
4. CONTACT PERSONS<br />
For any queries following persons can be contacted:<br />
Sh. Ajay Gupta, Sr. Regional Manager, EM Cell, Jaipur, Ph:91-941_4047970<br />
Sh. Tarun P. Gupta, Astt. Regional Manager, EM Cell, Jaipur, Ph:91-94L4047742<br />
The Technical <strong>and</strong> Financial bids are to be enclosed in two separate envelopes duly<br />
marked as Technical Bid & Financial Bid. Both these envelops are to be placed in<br />
covered envelop <strong>and</strong> submitted to OSD (EM), <strong>RIICO</strong> Ltd. upto 5.OO pm of 11.02.20L3.<br />
The technical bid shall be opened on 15.02.2013 at 10:30 am <strong>and</strong> Financial Bid of<br />
successful (technically qualified) bidders shall be. opened on 8.03.2013 at j,0:30 am in<br />
Room No. 4 (Ground Floor), <strong>RIICO</strong> Ltd. Udyog Bhawan, Tilak Marg, Jaipur.<br />
Signature,<br />
Name & Address of<br />
Bidder with mobile number<br />
or\r]
RAJASTHAN STATE INDUSTRIAT DEVETOPMENT AND INVESTMENT<br />
CORPORATION LIMITED, UDYOG BHAWAN, TITAK MARG, JAIPUR<br />
- Calling consultants/organizations for conducting area specific<br />
survey for preparing Action Plan for Dyeing & Printing Industries<br />
of Bhilwara, Balotara, Bithuja, Jasol <strong>and</strong> Sanganer<br />
FINANClAt BID<br />
osD (EM)<br />
<strong>RIICO</strong> Limited, Udyog Bhawan<br />
Tilak Marg, Jaipur - 302005<br />
RAJASTHAN<br />
t-/<br />
N$- -
RAJASTHAN STATE INDUSTRIAL DEVETOPMENT AND INVESTMENT CORPORATION<br />
LIMITED, UDYOG BHAWAN, TILAK MARG, JAIPUR<br />
Name of work: Calling consu lta nts/organizations for conducting Area Specific<br />
Survey for preparing Action Plan for Dyeing & printing lndustries of<br />
Bhilwara, Balotara, Bithuja, Jasol <strong>and</strong> Sanganer.<br />
H-Schedule<br />
Pa rticu la r Rate to be<br />
quoted by the<br />
bidder as<br />
complete job<br />
The following scope of work is<br />
consu lta nt/conce rn to achieve the desired<br />
expected from the<br />
objective/resu lts:<br />
a. Desk Review<br />
Collection <strong>and</strong> examination of reports on studies carried out by<br />
various agencies in past<br />
b. Assessment of Existing System<br />
Visits to the site <strong>and</strong> collection of preliminary inform ation/data<br />
related to, Number <strong>and</strong> nature of industries, source of water, its<br />
quality <strong>and</strong> sustainability: Assess the quantity of water being<br />
consumed, classification of sources based on quality as well as<br />
location, i.e. from local source or from surrounding areas.<br />
1. Effluent discharged - its quantity <strong>and</strong> characte ristics,<br />
2. Quantity of wastewater. being treated, nature of treatment,<br />
3. Studying the performance of the existing CETps, based on<br />
the plant laboratory data <strong>and</strong> suggestions on improvements<br />
4. Mode of disposal <strong>and</strong> disposal related problems,<br />
5. Problems related to solid waste/hazardous waste disposal,<br />
6. Problems related Air pollution, if any,<br />
7. Adequacy of existing conveyance system.<br />
c. Survey <strong>and</strong> ldentification of waste Minimization measures<br />
Survey of various industries to ascertain water quality <strong>and</strong> quantity<br />
requirement <strong>and</strong> possibility of application of waste minimization<br />
measures (e.g. use of jiggers to replace tank washings).<br />
only (in Rs. )<br />
t)[.,-<br />
'//
Ground verification of data/informatio n gathered under item l. To<br />
the extent possible data related to quantity <strong>and</strong> characteristics of<br />
wastewater shall be verified through secondary data, <strong>and</strong> only<br />
where there is some doubt or there is no data available, samples<br />
shall be collected <strong>and</strong> analysed.<br />
d.<br />
i.<br />
it.<br />
iii.<br />
Preparation of wastewater Management Plan<br />
(Recommendation for solution)<br />
Expected growth of industries in next L5-20 years<br />
System lmprovement<br />
Recommendations on existing treatment plants <strong>and</strong><br />
requirements of additional facilities to achieve water<br />
optimization<br />
iv. Strategies to optimize Water utilization (Recycling/reuse)<br />
v. Recommendations on regulation of industries in these areas<br />
vi. Timing <strong>and</strong> priorities of intended action considering short<br />
<strong>and</strong> long term objective<br />
vii. Estimation <strong>and</strong> costing<br />
e. lmplementation Framework<br />
lmplementation framework will be prepared for identified action<br />
plans of short <strong>and</strong> long term.<br />
l. Extent of Project Area<br />
lntegrated Wastewater Management Plan (llWMp) will be prepared for textile<br />
dyeing <strong>and</strong> printing industries units of Bhilwara, Balotara, Sanganer, Bithuja &<br />
Jasol ind ustria I areas.<br />
ll. Final Outputs<br />
Following output shall be furnished by the consultant:<br />
a) lnception Report<br />
Brief description of purpose of the plan, methodology, background of the<br />
project area, physical condition of project area, existing waste water<br />
management system <strong>and</strong> further work plan.<br />
b) Draft Report<br />
' Shortcoming in the dxisting system; ldentification, quality <strong>and</strong> quantification<br />
of waste generation sources; survey, recommendations for solution (the<br />
Plan), costing & estimation <strong>and</strong> implementation framework.
c) Final Report<br />
Waste water Management plan after incorporating all suggestions <strong>and</strong><br />
recom me nd ations.<br />
lll. Schedule of Completion of Tasks<br />
The followins schedule is to be reckoned from the date of award award.<br />
. S. No, Task Schedule Time<br />
7 lnception Report 1.0 month<br />
2 Draft Report 5.0 month<br />
3 Final Report 6.0 month<br />
lV. Payment Schedule<br />
Consultancy Fee for services would be as per enclosed Financial proposal <strong>and</strong><br />
shall be paid as follows:<br />
> 25% on submission of lnception Report<br />
> 50% on submission of Draft Report<br />
> 25% on submission of Final Report<br />
V. Terms <strong>and</strong> Conditions<br />
1. The Consultant is expected to have visited the site of work personally <strong>and</strong><br />
acquainted himself in respect the scope of work <strong>and</strong> other relevant information<br />
related to the work before tendering for the work.<br />
2. The consultant shall bear all cost associated with the preparation <strong>and</strong> submission<br />
of the bld including any site visit <strong>and</strong> collection of data made for this purpose.<br />
3. All prices to be quoted by the bidders shall be inclusive of all taxes, duties, levies<br />
etc.<br />
4. Bid shall remain valid <strong>and</strong> open for acceptance for a period of 70 days after the<br />
date of Financial Bid opening.<br />
5. The tender rates must be legibly written in both figures <strong>and</strong> in words. Overwriting<br />
of the rates will not be entertained.<br />
6. All tender documents should be complete in all respect <strong>and</strong> bidders must return<br />
the documents containing detailed terms <strong>and</strong> conditions duly signed on each<br />
page.<br />
7. The work is to be completely finished to the satisfaction of the Engineer tn-Charge<br />
within ninety days from the date of written order to commence the work.<br />
8. The corporation reserves the right to accept/reject any or all of the tenders<br />
without assigning any reason what so ever <strong>and</strong> its decision will be final.<br />
9. No conditional offer will be accepted.<br />
L0. Price quoted should be firm <strong>and</strong> without any escalation clause.<br />
Y<br />
\J.-.
L1.. lt will be responsibility of the bidders to provide deploy any machinery/<br />
equipment/ instrument which may be required for the purpose of the job.<br />
L2. ln.case the agency/bidder(s) fails to do the above work at any stage then all<br />
amount released by the Corporation shall be recovered from the agency / bidders<br />
with forfeiting earnest money/ performance guarantee amount..<br />
L3. Alternative bids will not be considered.<br />
14. AII the conditions ofthe bid shall be accepted by the bidder.<br />
15. Also the clauses such as agreement, force majeure paying authority etc. as per<br />
general conditions of contract of Corporation shall be accepted.<br />
16. The scope of work can be increased or decreased at the discretion of the<br />
Corporation.<br />
17. Bid documents are not transferable. Bids received from bidders in whose name<br />
the bid documents have been issued only shall be considered.<br />
18. The bidder shall submit an authorisation letter mentioning the name of its<br />
representative alongwith its attested signature for participation in the bid.<br />
19. The tender/bids containing any concealment of any information or wrong<br />
information will be liable to be rejected also liable to be debarred from tendering<br />
works in the Corporation for a specific period Signed<br />
Note: 1. The rates are valid for a period of 70 days from the date of submission of<br />
bid.<br />
sva\'v<br />
o)).ftM!<br />
Note: l/we have gone through the scope of work <strong>and</strong> the rates have been quoted<br />
accordingly.<br />
l/we agree to execute the above work on quoted rates.<br />
Signature of bidder/consultant with<br />
full address <strong>and</strong> contact number