I. BROAD OUTLINES OF THE PROJECT.<br />
1.01 Particulars <strong>of</strong> Project/Company<br />
a) Date <strong>of</strong> incorporation<br />
b) Location<br />
Regd. Office/Controlling Office<br />
Factory<br />
Industry<br />
Product<br />
c) Installed Capacity<br />
1.02 Capital Structure<br />
a)Authorised Capital<br />
b)Paid up capital (Proposed)<br />
1.03 Management<br />
a) Board <strong>of</strong> Directors<br />
b) Managing Director<br />
(Proposed)<br />
1.04 Brief Particulars <strong>of</strong> the Project/Company<br />
a) Plant & Machinery<br />
b) Raw Materials<br />
1.05 Utilities<br />
a) Power<br />
b) Water<br />
1.06 Effluent<br />
1.07 Employment<br />
1.08 Expected date <strong>of</strong> commercial production<br />
1.09 Government Consents.<br />
II. PROPOSAL IN BRIEF- Brief write up on project.<br />
III. PROMOTERS DETAILS<br />
3.1 Name, Education, Age etc.<br />
3.2 Experience<br />
3.3 Relevance <strong>of</strong> background for project<br />
3.4 Tax Status<br />
3.5 Inter-Relationship<br />
3.6 Associate Concerns.<br />
3.7 Organization & Management <strong>of</strong> proposed project<br />
3.8 Shareholding Pattern<br />
3.9 Details <strong>of</strong> Bankers<br />
IV. THE PROJECT DETAILS<br />
4.1. Project- Define product with specification<br />
4.2 Technology- Level <strong>of</strong> technology and source<br />
4.3 Manufacturing Process<br />
4.4 Location and Site<br />
4.5 Raw Material<br />
4.6 Plant and Machinery with details <strong>of</strong> layout<br />
4.7 Details <strong>of</strong> building layout with justification <strong>of</strong> area.<br />
4.8 Utilities<br />
- Power (KWH-connected load)<br />
- Water<br />
- Manpower<br />
- Effluent treatment-details <strong>of</strong> the effluent generated and treatment there<strong>of</strong>.<br />
4.9 Implementation Schedule indicating starting and completion months<br />
V. COST OF THE PROJECT.<br />
FORM A-III