(iii) Charges for permitting use <strong>of</strong> an industrial plot for warehousing purposes will be<br />

as under:<br />

(a) For new applicants<br />

One time <strong>of</strong> the prevailing development charges <strong>of</strong> the industrial area concerned<br />

on the basis <strong>of</strong> built up space actually being used for warehousing purposes.<br />

(b) For regularization <strong>of</strong> existing warehousing activity in industrial plots:<br />

1.25 times the prevailing development charges <strong>of</strong> the industrial area concerned<br />

on the basis <strong>of</strong> built up space actually being used for warehousing purposes.<br />

Note: Permission for Commercial Warehousing related to storage <strong>of</strong> food grains will be considered<br />

only in the Agro Food Parks and not in other industrial areas.<br />

(amended as per item 24 <strong>of</strong> the IDC's meeting held on 16.12.2009, The' note' inserted as per item 8<br />

<strong>of</strong> IDC meeting held on 18.10.2010 )<br />

8.2.1 a. Permission for godowns <strong>of</strong> LPG Cylinders in <strong>RIICO</strong> industrial areas<br />

may be granted on levy <strong>of</strong> regularization/permission charges @ 1.25<br />

times <strong>of</strong> development charges <strong>of</strong> the constructed area <strong>of</strong> industrial plots.<br />

b. The above regularization/permission would be subject to<br />

approval/license by Petroleum Safety Organization, Nagpur.<br />

c. The above permission will be accorded by a head <strong>of</strong>fice Committee as<br />

constituted for deciding cases <strong>of</strong> change in land uses.<br />

((inserted as per item 3 <strong>of</strong> the meeting dt 4.5.2011. Further inserted as per circular no<br />

1/2012 dated 7.2.2012)<br />

8.3: Conversion <strong>of</strong> <strong>Land</strong> Use <strong>of</strong> part land <strong>of</strong> an industrial plot for the purpose <strong>of</strong><br />

setting up <strong>of</strong> Weigh Bridge will be permitted observing requirement <strong>of</strong> minimum<br />

area i.e. 510 Sq. Meter for the same as well as other technical parameters as<br />

prescribed in the building regulations <strong>of</strong> the Corporation. For this purpose the<br />

conversion charges shall be recovered from allottee being treated as commercial<br />

purposes. The said conversion will be permitted notwithstanding with requirement<br />

<strong>of</strong> <strong>Rule</strong> 17-B(ii) which inter-alia provides that smallest sub-divided plot should be<br />

<strong>of</strong> size equal to minimum 25% <strong>of</strong> area <strong>of</strong> original plot.<br />

(inserted as per item 24 <strong>of</strong> the meeting dt 16.12.2009)<br />

8.4: Permission to set up an Hotel on an allotted industrial plot:<br />

Permission to set up a hotel on an industrial plot may be granted without levying any<br />

additional charges on this account. The requests seeking such permission will be<br />

examined and considered by the existing committee constituted for considering cases <strong>of</strong><br />

land use conversions. The said permission will be subject to observing the technical<br />

norms / building parameters etc. as are relevant to the hotel set up, in the rules and also<br />

the requisite clearances from the statutory authority / bodies, if any required. (Amended as<br />

per decision by the IDC with reference to item 1 <strong>of</strong> its meeting held on 2.11.2010)