2. In case where the allotments are made prior to development <strong>of</strong> the area, lease<br />

agreement shall be executed within 30 days from the date the area is declared<br />

developed and the concerned Sr.DGM/SRM/RM there<strong>of</strong> gives notice.<br />

(Inserted as per IDC decision taken vide item 11 on 21.02.1998 and <strong>of</strong>fice<br />

order No. IPI/F-1(9)2/82 dated 29 th October, 2003)<br />

13. RE – SCHEDULEMENT The Chairman & Managing Director shall on being<br />

OF INSTALMENT satisfied, revise the schedule <strong>of</strong> repayment <strong>of</strong><br />

14. WATER & POWER<br />

outstanding instalments in genuine cases <strong>of</strong> sick<br />

industrial units.<br />

(Substituted as per IDC decision taken vide item 22<br />

on 1.9.1999)<br />

The Chairman & Managing Director may allow reschedulement<br />

<strong>of</strong> due balance development charges<br />

alongwith interest, on the case to case basis, in cases <strong>of</strong><br />

plots allotted for setting-up <strong>of</strong> institutions.<br />

(Inserted as per IDC decision taken vide item 5 on<br />

12.11.2002)<br />

<strong>Rule</strong> 14(a) – Water<br />

Where water lines are provided by the Corporation, it<br />

will be provided upto the main roads only. The<br />

applicants shall take water lines from the mains lines<br />

opposite to their plots at their expenses.<br />

<strong>Rule</strong> 14(b) – Power<br />

(i) Power line <strong>of</strong> class upto 11 KV will be provided<br />

upto the premises <strong>of</strong> the allottee at the cost <strong>of</strong><br />

<strong>RIICO</strong>. Thereafter, the cost <strong>of</strong> service line from the<br />

power line to inside the premises shall be borne by<br />

the applicant.<br />

(ii) <strong>RIICO</strong> in no case will provide cost for the laying<br />

<strong>of</strong> power lines above 11 KV class whether inside<br />

or outside the industrial area.<br />

(iii) Where sub-division <strong>of</strong> allotted plot has been<br />

allowed by <strong>RIICO</strong> and a separate connection is<br />

desired in such sub-divided plot, the complete cost<br />

<strong>of</strong> electric connection would be borne by the<br />

applicant. This condition is also to be incorporated<br />

in the permission given for sub-division.<br />

(iv) In case <strong>of</strong> load extension <strong>of</strong> an industry, all the<br />

charges will be paid by the applicant and <strong>RIICO</strong><br />

will not bear the charges for allowing load<br />

extension.<br />

(v) In the case where electric connection is existing<br />

and the plot has been transferred/ sold/ auctioned<br />

and transferee/ purchaser requires a new<br />

connection in the plot, all charges towards the<br />

connection will be borne by the applicant. <strong>RIICO</strong>