OPRE 6302 on 20 March 2008 - The University of Texas at Dallas

OPRE 6302 on 20 March 2008 - The University of Texas at Dallas

OPRE 6302 on 20 March 2008 - The University of Texas at Dallas

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(a) 12 hours 47 minutes<br />

(b) 15 hours<br />

(c) Less than 10 hours<br />

(d) 55 hours<br />

(e) Between 45 and 50 hours<br />

A, 22+5*149=767 mins, Larissa<br />

6. All hand-carry bags have to be X-rayed <strong>at</strong> airports. X-ray machines have c<strong>on</strong>veyer belts transferring bags<br />

to and through the X-ray machine. <strong>The</strong> porti<strong>on</strong> <strong>of</strong> the belt outside the machine usually holds 4 bags <strong>at</strong> a<br />

given time and it takes 12 sec<strong>on</strong>ds for a bag to reach the machine. <strong>The</strong>n an X-ray inspector looks <strong>at</strong> the<br />

X-ray picture <strong>of</strong> the bag while it is <strong>on</strong> the belt but inside the X-Ray machine. Checking the picture takes<br />

3 sec<strong>on</strong>ds per bag. Which <strong>of</strong> the following is the capacity in bags/minute <strong>of</strong> the entire X-raying oper<strong>at</strong>i<strong>on</strong><br />

including bag transfers?<br />

(a) 10<br />

(b) 15<br />

(c) <strong>20</strong><br />

(d) 25<br />

(e) N<strong>on</strong>e <strong>of</strong> the above<br />

A, 10 per minute, six sec<strong>on</strong>ds for each bag. 3 sec in the machine. 3 sec<strong>on</strong>ds to the machine. Yi-Fan<br />

7. Computers R Us has COGS <strong>of</strong> $18 B per year and keeps $450 M <strong>of</strong> inventory, wh<strong>at</strong> is the flowtime <strong>of</strong> an<br />

average item in days (A m<strong>on</strong>th has 30 days, a year has 12 m<strong>on</strong>ths)?<br />

(a) 10<br />

(b) 15<br />

(c) <strong>20</strong><br />

(d) 25<br />

(e) N<strong>on</strong>e <strong>of</strong> the above<br />

E 0.45/180=1/40 year=12/40 m<strong>on</strong>ths=3/10 m<strong>on</strong>ths=9 days. Liz Reeves<br />

8. Which <strong>of</strong> the following is not a reas<strong>on</strong> why companies plan to hold inventory?<br />

(a) Due to pipeline inventory<br />

(b) Unstable demand and supply<br />

(c) Ec<strong>on</strong>omies <strong>of</strong> scale<br />

(d) To have buffers so disrupti<strong>on</strong> <strong>of</strong> an activity does not stop the whole process<br />

(e) To accommod<strong>at</strong>e the excess supply which exceeds the demand<br />

E June Lee<br />

9. In an assembly oper<strong>at</strong>i<strong>on</strong> <strong>at</strong> a furniture factory, five workers assemble an average <strong>of</strong> 350 standard dining<br />

chairs per 7-day week. Wh<strong>at</strong> is the labor productivity <strong>of</strong> this oper<strong>at</strong>i<strong>on</strong>?<br />

(a) 50 chairs/(worker x week)<br />

(b) 70 chairs/week<br />

(c) 10 chairs/(worker x week)<br />

(d) 50 chairs/day<br />

(e) 70 chairs/(worker x day)